Posts for si-list, 12-2006

Browse: Last Month: 11-2006    Main Archive Page    Next Month: 01-2007

By Date / By Date Reverse / By Threads

  1. » [SI-LIST] Re: DDR2 IMPEDANCE, tao xu
  2. » [SI-LIST] Re: trace length matching, tao xu
  3. » [SI-LIST] Product engineer position at PLX, Dev Malladi
  4. » [SI-LIST] Spectre S-parameter based modeling- Stability issues, Madhusudanan K Sampath
  5. » [SI-LIST] Measuring signals in the presence of significant noise - part 2, Doug Smith
  6. » [SI-LIST] Re: Spectre S-parameter based modeling- Stability issues, Dmitriev-Zdorov, Vladimir
  7. » [SI-LIST] IBIS Model, Coombs, William B. \(US SSA\)
  8. » [SI-LIST] About S2ibis3, james cui
  9. » [SI-LIST] Re: IBIS Model, Beal, Weston
  10. » [SI-LIST] IPC/DC Boston mtg, 13-Dec, Jeff Seeger
  11. » [SI-LIST] Fab capabilities, sunil bharadwaz
  12. » [SI-LIST] HSPICE Fieldsolver vs FastHenry, Andy Kuo
  13. » [SI-LIST] Re: Fab capabilities, B Simonovich
  14. » [SI-LIST] Re: HSPICE Fieldsolver vs FastHenry, Jory McKinley
  15. » [SI-LIST] CST vs. HFSS, QU Perry
  16. » [SI-LIST] Re: Update on Pulse Research Lab 12 GHz clock divider sample, Steven Kan
  17. » [SI-LIST] SI related jobs at Mobilygen;, Mark Apton
  18. » [SI-LIST] December 2006 IEEE EMC Silicon Valley Chapter meeting. Topic: Incorporate RoHS and WEEE in to production design, Oscar Fallah
  19. » [SI-LIST] Free Oscilloscope Tools Software, Tom Zych
  20. » [SI-LIST] SI Tool Justification Document, Vince Di Lello
  21. » [SI-LIST] ROOKIE: Anti-Pad Size Effect On Signal Integrity, Clarke, Paul
  22. » [SI-LIST] High speed board design project (6-9 months) in Bay Area, CA, Kevin Pierpoint
  23. » [SI-LIST] Re: ROOKIE: Anti-Pad Size Effect On Signal Integrity, Salkow, Steven
  24. » [SI-LIST] Re: ROOKIE: Anti-Pad Size Effect On Signal Integrity:By the formula, as F goes up, Xc goes down (was up by typo), Salkow, Steven
  25. » [SI-LIST] CPLD Device Failures..., srinivasarao d
  26. » [SI-LIST] Insertion Loss of Passive Components, ryansatrom
  27. » [SI-LIST] Re: ROOKIE: Anti-Pad Size Effect On Signal Integrity: By the formula, as F goes up, Xc goes down (was up by typo), Salkow, Steven
  28. » [SI-LIST] Reg: USB OTG Controller, Marimuthu P.
  29. » [SI-LIST] Re: Insertion Loss of Passive Components, Hill, John
  30. » [SI-LIST] Variable Freq generator for Circuit/Schematic Testbenching, Taha Amiralli
  31. » [SI-LIST] 3 month project in Milpitas, CA (ONSITE), Kevin Pierpoint
  32. » [SI-LIST] Looking for Signal Integrity Trainer Kits, Harmit
  33. » [SI-LIST] Decoupling Strategy??, Simba Julian
  34. » [SI-LIST] Re: Decoupling Strategy??, Mark Alexander
  35. » [SI-LIST] Job opening: Senior EMI/EMC Engineer, Tanmoy Roy
  36. » [SI-LIST] Eye Diagram Viewing Tool, Daniel Chow
  37. » [SI-LIST] Eye Diagram comparison, Tang, George
  38. » [SI-LIST] Re: CST vs. HFSS, dgun
  39. » [SI-LIST] Inductors, sunil bharadwaz
  40. » [SI-LIST] Validating IBIS Models, Tim Coyle
  41. » [SI-LIST] Transmission line impedance, Sam Pete
  42. » [SI-LIST] Re: Transmission line impedance, Yafei Bi
  43. » [SI-LIST] Re: R: Transmission line impedance, Chockalingam Selvaraj
  44. » [SI-LIST] which vendors have good ibis/spice models for 4-rank ddr2 rdimm register ?, agathon
  45. » [SI-LIST] Why 50 ohms? The history., agathon
  46. » [SI-LIST] Re: Why 50 ohms? The history., Cortex.Chen
  47. » [SI-LIST] Re: Out of Office AutoReply: which vendors have good ibis/spice models for 4-rank ddr2 rdimm register ?, agathon
  48. » [SI-LIST] Re: which vendors have good ibis/spice models for 4-rank ddr2 rdimm register ?, agathon
  49. » [SI-LIST] ibis, abhishek@xxxxxxxxx
  50. » [SI-LIST] Differential traces over a split in the ground plane, tom_cip_11551
  51. » [SI-LIST] Re: ibis, Ambrish Varma
  52. » [SI-LIST] Calling libraries in Hspice, npatel
  53. » [SI-LIST] ESD Symposium interviews, Doug Smith
  54. » [SI-LIST] DDR2 Clock and DQS Lines, Kenny Frohlich
  55. » [SI-LIST] Re: DDR2 Clock and DQS Lines, Cortex.Chen
  56. » [SI-LIST] Stimulus for spice-to-IBIS, wuliang
  57. » [SI-LIST] How to setup SI team, how to be SI team manager and how to make SI project plan?, fei xue
  58. » [SI-LIST] Hspice simulation is too slow, 송인명
  59. » [SI-LIST] Re: How to setup SI team, how to be SI team manager and how to make SI project plan?, Fabrizio . Zanella
  60. » [SI-LIST] Arm development platform - may be off from SI topics, Sumathi Kuppuswamy