[rc3r] Small Layout Update

  • From: Thomas Gilsdorf <tlg225ccr94@xxxxxxxxxxx>
  • To: rc3r@xxxxxxxxxxxxx
  • Date: Tue, 17 Jul 2018 16:59:21 -0400


I miss-spoke regarding the legs in my last email. I meant to say that yesterday 
I had cut and assembled an additional 12 legs. I will be @ Rob Johnson's 
tomorrow evening to chamfer all 29 legs. The 12 extra legs cost ~$110.


Wood blocks have been glued on all 7 modules for mounting the terminal strips. 
Today terminal strips have been mounted on 3 of 7 modules. In addition, the bus 
wiring and track power feeders are wired on those 3. I'll be continuing with 
the wiring early tomorrow morning. The rain has me shut-down for now.


My goal is to have all modules pre-wired and standing on legs prior to the next 
meeting. 


After the meeting, and working together I sincerely think we can lay the track 
in 2-3 hours (tops). I'm 99.9% sure we have all the track pieces we need. If 
need be, I can run home and raid my stash if necessary.


Items that are "Still to buy":


(12) 2 1/2" C clamps (reduced from my initial estimate)
Plastic toolbox to store the clamps
Extension cord w/reel
(8) 1x4x6' each cut in half to make 16 Plexiglas barriers (we already have the 
cut Plexiglas)
Velco for mounting skirts (we already have the skirts, thank you Kevin)
Scenery: Foam ground cover, streets, glue, ballast


At our last meeting we discussed Menards buildings for this layout. None have 
been purchased yet. If you want to look at Menards buildings, click HERE. Lets 
us know what you would like to see on this layout.


I am looking forward to our next meeting. We are closing in on the original $2K 
budget.  


Right now the buildings that are "set" are:


Ashland Train Station w/ passenger platform
MTH Grainery
Single stall engine shed
Coal loading station
Operating Lionel flip-sign


Thomas Gilsdorf
tlg225ccr94@xxxxxxxxxxx

Other related posts: