Before reverting to best cost plan, there are two attempts to reproduce the baselined plan id. SPM trace is pretty clear about this. SPM lists "round 1" as plan outline + session OFE (optimizer features enable). If the plan still doesn't match then "round 2" is hinted OFE only. Cheers, Dominic -- //www.freelists.org/webpage/oracle-l