Re: Quick standby setup

  • From: Mike Killough <mwkillough@xxxxxxxxxxx>
  • To: Andy Sayer <andysayer@xxxxxxxxx>
  • Date: Fri, 9 Sep 2022 20:02:24 +0000

Ok so switch roles not failover, B primary role and A and C standbys. Remove A 
from configuration, shutdown and close up shop at data center

Sent from my iPhone

On Sep 9, 2022, at 2:32 PM, Andy Sayer <andysayer@xxxxxxxxx> wrote:


Instead of doing a failover, you would need to do a switchover. You should set 
up your redoroutes in advance in dgmgrl. You should also use this to test the 
configuration using the
Show configuration when primary is DB_B.
Syntax

Remove the old server from the redo routes before getting rid of it.

Hope that helps,
Andy

On Fri, Sep 9, 2022 at 11:51 AM, Mike Killough 
<mwkillough@xxxxxxxxxxx<mailto:mwkillough@xxxxxxxxxxx>> wrote:
Currently we have a primary database (DB_A) and 2 standbys (DB_B & DB_C). We 
are planning on hard failing over to one of the standby databases to retire the 
current primary. To protect the future standby when it becomes primary, we 
would like to be able to have a standby right away if possible. When we fail 
over to DB_B, is there a way to make DB_C immediately be the standby for DB_B?

Mike Killough

Sent from my iPhone

Other related posts: