Ok so I could do a switchover to B and C and A become standbys, then remove A
from the configuration before shutting it down and closing the data center? No
hard failover. Thanks
Sent from my iPhone
On Sep 9, 2022, at 2:32 PM, Andy Sayer <andysayer@xxxxxxxxx> wrote:
Instead of doing a failover, you would need to do a switchover. You should set
up your redoroutes in advance in dgmgrl. You should also use this to test the
configuration using the
Show configuration when primary is DB_B.
Syntax
Remove the old server from the redo routes before getting rid of it.
Hope that helps,
Andy
On Fri, Sep 9, 2022 at 11:51 AM, Mike Killough
<mwkillough@xxxxxxxxxxx<mailto:mwkillough@xxxxxxxxxxx>> wrote:
Currently we have a primary database (DB_A) and 2 standbys (DB_B & DB_C). We
are planning on hard failing over to one of the standby databases to retire the
current primary. To protect the future standby when it becomes primary, we
would like to be able to have a standby right away if possible. When we fail
over to DB_B, is there a way to make DB_C immediately be the standby for DB_B?
Mike Killough
Sent from my iPhone