Re: Quick standby setup

  • From: Andy Sayer <andysayer@xxxxxxxxx>
  • To: mwkillough@xxxxxxxxxxx
  • Date: Fri, 9 Sep 2022 12:31:51 -0700

Instead of doing a failover, you would need to do a switchover. You should
set up your redoroutes in advance in dgmgrl. You should also use this to
test the configuration using the
Show configuration when primary is DB_B.
Syntax

Remove the old server from the redo routes before getting rid of it.

Hope that helps,
Andy

On Fri, Sep 9, 2022 at 11:51 AM, Mike Killough <mwkillough@xxxxxxxxxxx>
wrote:

Currently we have a primary database (DB_A) and 2 standbys (DB_B & DB_C).
We are planning on hard failing over to one of the standby databases to
retire the current primary. To protect the future standby when it becomes
primary, we would like to be able to have a standby right away if possible.
When we fail over to DB_B, is there a way to make DB_C immediately be the
standby for DB_B?

Mike Killough

Sent from my iPhone

Other related posts: