Coming along nicely! On 14/11/2011 5:27 AM, stepney wrote: > Progress to date. > > http://www.alanstepney.info/he2s.jpg > > Back row, L to R: > Displacer (needs a clean), two flywheels, two bearing standards > > Main casting, crank pin, piston yoke, piston, power cylinder. > > Displacer con rod and shaft. > > At the front is a marked out piece of steel that will be the power > crankshaft. > I suspect that there was a casting for it, but I cant find it, so am > having to make one. > > All the other pins, bolts etc are made as are the cooling water > fittings. The latter still need the pipes, and I plan to have pumped > water, so will need to make a pump. > > The biggest item still to make is the "furnace" on which the engine stands. > > MODEL ENGINEERING DISCUSSION LIST. > > To UNSUBSCRIBE from this list, send a blank email to, > modeleng-request@xxxxxxxxxxxxx with the word "unsubscribe" in the subject > line. > > MODEL ENGINEERING DISCUSSION LIST. To UNSUBSCRIBE from this list, send a blank email to, modeleng-request@xxxxxxxxxxxxx with the word "unsubscribe" in the subject line.