Aaron, I sure wish we could see you finished product. 4 hours is a very long time to sew a design. Ron Thompson Poke-Me Embroidery San Jose, CA On 2/24/06, Linen Barn <linen@xxxxxxxxxxx> wrote: > > So I just finished sewing my 217k car logo and it only took 4 hours with 0 > thread breaks running at 1000 SPM. I ran this design about a year ago > before the new rollers and auto acti-feed feature at 1200 spm and it would > average 5-6 thread breaks and take over 5 hours. I thought it was > interesting how I can sew it slower yet having no thread breaks makes it > go > faster. > > I just put the 2nd one on so we will see if we can get through another w/o > any breaks. > > It does take 5 or 6 bobbin replacement :) > > Aaron Sargent > The Linen Barn > linen@xxxxxxxxxxx > 541-770-2957 > Medford, OR > >