[highland-discuss] Re: IMPORTANT: Road Work Next Week - Temporary Road Closure

  • From: Yarenis Rodriguez <yare0121@xxxxxxxxx>
  • To: highland-discuss@xxxxxxxxxxxxx
  • Date: Wed, 29 Apr 2020 10:44:00 -0400

Hi Alex, will be get at least 24 hours notice since I will have to take my
dog to be boarded since he is not light enough to carry to a patch of grass?

Thank you!

On Wed, Apr 29, 2020 at 9:52 AM Alex Agle <dmarc-noreply@xxxxxxxxxxxxx>
wrote:

Next week. 4th, 5th, or 6th of May.  Most likely the 4th based on weather
outlook.

Alex Agle
alex@xxxxxxxxx
C 404-229-3325
W 404-894-6165

On Apr 29, 2020, at 9:37 AM, NITA STEWART <nitaastewart@xxxxxxx> wrote:


Hi Alex, can you give us the date of the projects, Monday or Tuesday or
Wednesday? Thank you

Get Outlook for Android <https://aka.ms/ghei36>

------------------------------
*From:* highland-discuss-bounce@xxxxxxxxxxxxx <
highland-discuss-bounce@xxxxxxxxxxxxx> on behalf of Joseph Curtis <
josephcurtis07@xxxxxxxxxxx>
*Sent:* Tuesday, April 28, 2020 4:59:32 PM
*To:* highland-discuss@xxxxxxxxxxxxx <highland-discuss@xxxxxxxxxxxxx>
*Subject:* [highland-discuss] Re: IMPORTANT: Road Work Next Week -
Temporary Road Closure

So are we printing up a letter for each household and placing them on the
door. I don’t think everyone is going to get the message in the list serve.
Also are we going to put up some sort of road block at the gate so we don’t
have a repeat of the last time? The way it is now, we have no control over
delivery of ups or anything else.
Thanks
Sent from my iPhone

On Apr 28, 2020, at 4:22 PM, Alex Agle (Redacted sender alex for DMARC) <
dmarc-noreply@xxxxxxxxxxxxx> wrote:



Hi everyone,

This email is being sent so that you can begin planning now.  More
information on the exact dates and times will follow.

The HOA is currently in the final stages of planning the sealcoat
project.  This is where cracks in the road are filled, and a tar spray
paint is applied to the road's surface.  The coating takes approximately 24
hours to cure.  This maintenance is typically performed every 9-10 years,
and it extends the life of the road.

This project is of a large magnitude and will directly affect each
resident.  We ask for your understanding and cooperation during the
project.  We apologize in advance for the inconvenience that you will
experience.

*The neighborhood road (pavement) will be closed to all vehicles and
pedestrians for a 24 hour period next week.*  You will not be able to
drive or walk on the pavement.  You may walk on the cement strips that
border the pavement, and it is possible to reach each unit on foot without
stepping on the pavement.

The exact day is still to be determined, but we are aiming for Monday with
Tuesday and Wednesday as backup days, depending on weather.  If there is
more than a 30-40% chance of rain, then the project will be postponed to
the next day.  Most likely it will be an 8AM-8AM period.  We will provide
more details before the end of the week.

Preparation steps for residents:

1. Avoid scheduling deliveries or pickups between Monday - Wednesday.  In
the event that a delivery or pickup cannot be made, they will make another
attempt the next day.

2. Avoid scheduling contractors or moving trucks.

3. Vehicles that are parked in driveways cannot cover the cement strip on
the day of the project, or they will be towed.  Typically these are larger
trucks that occupy the full length of the driveway.  The logic here is that
these cement strips will serve as temporary sidewalks to allow people to
access their units on foot.  We will place notices on these vehicles ahead
of time to increase awareness.  We will also attempt to make contact with
affected units before calling for a tow.

4. Guest parking spaces must be vacated by 8AM on the day of the project,
or vehicles will be towed.

5. Remove your car from your driveway or garage by 8AM on the day of the
project if you plan to drive that day.  If you don't plan to drive, then it
is fine to leave your vehicle in your garage or driveway.

   1.

   Vehicles in driveways have little risk of the spray being blown but
   residents are encouraged to put their vehicle(s) in the garage, off the
   property, or cover the vehicle during the day of repair.

   BluePrint Painting and Renovations, the Highland Unit Owners
   Association, and Community Management Associates will not be held
   responsible should this occur, so please take appropriate precautions.

6. If you plan to drive on the day of the project, you will need to park
your vehicle outside of the neighborhood for one night.  Possible parking
options are Hilliard St, the grassy lot across the street from Hilliard,
Cain St (near Jackson St bridge), and the Atlanta Medical Center (AMC)
parking lot (across from Highland).  The AMC option is the most secure, and
there is a $6 charge.

7. Make mental notes on how you can access your unit on foot without
walking on the pavement.  Note that the 400 and 500 buildings can only be
accessed via the rear pedestrian gate.

Residents who walk or drive on uncured sealcoat *will be fined a minimum
of $500*, plus the cost to repair or replace the damaged areas!  During
the last project, a UPS truck drove onto uncured sealcoat, and you can
still see tire marks near the 900 building.

Thanks,
Alex
--
Alex Agle
alex@xxxxxxxxx
C 404-229-3325
W 404-894-6165


Other related posts: