The Division Point D-10 has now been deferred to 2010. I'm still hoping but
hope is beginning to fade.



Yeah, the project keeps getting pushed out because to get the price point they 
need a certain amount of pre-orders.  The only way it will move forward is that 
they get the orders.  It will be hard with the economic downturn.

The CPHA has worked with DVP with their G3 and P2 projects.  The G3 model 
speaks for itself.  For the D10 project we provided DVP with over 50 drawings.  
It should be an amazing model.  You don’t want to miss out.

Jeff Pinchbeck