Want me to take a little more time before I answer, Ray??
Steve Lucas.
--- In cpsig@xxxxxxxxxxxxxxx, "rlkennedy27" <r.l.kennedy@...> wrote:
This is intended for railfans. Railroaders familiar with UCOR might want to
wait 24 hours before replying.
Situation:
You are engineer on a regular passenger train operating under UCOR in non-CTC
territory.
All is normal until suddenly you spot a yellow over red flag. You reduce
speed preparing to stop at a red flag ahead.
What is the FIRST thing you do?
Secondary: You have no orders covering this unexpected situation. Why not?