Anyone working on this? Because I wouldn't mind giving it a shot. Osi Osi Van Dessel CAS IT Mechanical Engineering Class of 2017 ovdessel@xxxxxx On Fri, Nov 8, 2013 at 3:20 AM, Evan Lowell <elowell@xxxxxx> wrote: > I finished my part on Wednesday. It is in locker 5 in the tinker lab. > However, it has two extra holes on it, but they do not compromise it > structurally. I would offer to do it but not be around this evening and > afternoon. > On Nov 8, 2013 2:53 AM, "Armor Harris" <armorharris@xxxxxxxxx> wrote: > >> Hey guys, >> >> We'd like to test the pyro valve this weekend, but we're still waiting >> for one bulkhead to be made. Evan Lowell has the other one and he should >> have it done by tomorrow, but we're looking for someone to do part #414 >> tomorrow (Friday) between 3pm and 6pm in the tinker lab. >> >> Before 3, Mehmet will be using the NC mill on valve housings and we don't >> want to bump him off that. >> >> Attached is the drawing; it shouldn't take very long. Can someone do this >> and deliver it to the wind tunnel by Saturday morning? >> >> Thanks, >> Armor >> >