I finished my part on Wednesday. It is in locker 5 in the tinker lab. However, it has two extra holes on it, but they do not compromise it structurally. I would offer to do it but not be around this evening and afternoon. On Nov 8, 2013 2:53 AM, "Armor Harris" <armorharris@xxxxxxxxx> wrote: > Hey guys, > > We'd like to test the pyro valve this weekend, but we're still waiting for > one bulkhead to be made. Evan Lowell has the other one and he should have > it done by tomorrow, but we're looking for someone to do part #414 tomorrow > (Friday) between 3pm and 6pm in the tinker lab. > > Before 3, Mehmet will be using the NC mill on valve housings and we don't > want to bump him off that. > > Attached is the drawing; it shouldn't take very long. Can someone do this > and deliver it to the wind tunnel by Saturday morning? > > Thanks, > Armor >