I can make these Sent from my iPhone > On Mar 6, 2015, at 8:28 AM, David Sindel <spacescienced13@xxxxxxxxx> wrote: > > One additional item - I cam going to need two sharpened bolts (it may be > worth making three or four) to force alignment when the beam is raised. > You'll just need to take a couple bolts (TS137; they're 1/2"-13 x 4.5" bolts > in a bag in a box on the test stand table), cut them on the chop saw in EPIC, > and sharpen them on a grinder. I'd prefer someone who knows how to do that > already, as I can't be around today to teach. Thanks! > >> On Fri, Mar 6, 2015 at 1:26 AM, Armor Harris <armorharris@xxxxxxxxx> wrote: >> The rocket is leak free (can't say as much about the valve box just yet) and >> the electronics are working again. >> >> Plan for Friday between noon and 6pm. The trailer will get here at noon, >> trying to get it into SIF, if not will be put on Babbit St. Here's what we >> need people for and what we need to do: >> Trailer to do list: >> Install valve box >> Install GOD box >> Check fits of gas cylinders >> Screw down hoses around the triangles >> Figure out a way to cushion the beam when it comes down >> Figure out a way to not scratch up the rocket on the beam when we slide it on >> Leak check N2O lines on trailer >> Install gas cylinders on trailer and leak check >> Rocket to do list: >> Button up, install top plate and sleeve, seal up kronos bay, connect >> ematches >> >> Friday night we will load the rocket on the trailer. Following that, dry >> runs with the rocket on the trailer while we secure it and prep for transport >> >> If we cannot store the rocket at SIF, we will need to monitor the trailer >> throughout the night until the morning (BU requirement). Hopefully we don't >> have to do this, but it would be good to get some volunteers for this that >> aren't Dean/Joe/myself in the event that we aren't able to store the rocket >> at SIF. > > <TS252 Sharpened Bolt.PDF>