The rocket is leak free (can't say as much about the valve box just yet)
and the electronics are working again.

Plan for Friday between noon and 6pm. The trailer will get here at noon,
trying to get it into SIF, if not will be put on Babbit St. Here's what we
need people for and what we need to do:

   - Trailer to do list:
   - Install valve box
   - Install GOD box
   - Check fits of gas cylinders
   - Screw down hoses around the triangles
   - Figure out a way to cushion the beam when it comes down
   - Figure out a way to not scratch up the rocket on the beam when we
   slide it on
   - Leak check N2O lines on trailer
   - Install gas cylinders on trailer and leak check

Rocket to do list:
Button up, install top plate and sleeve, seal up kronos bay, connect
ematches

Friday night we will load the rocket on the trailer. Following that, dry
runs with the rocket on the trailer while we secure it and prep for
transport

If we cannot store the rocket at SIF, we will need to monitor the trailer
throughout the night until the morning (BU requirement). Hopefully we don't
have to do this, but it would be good to get some volunteers for this that
aren't Dean/Joe/myself in the event that we aren't able to store the rocket
at SIF.