I am in the process of upgrading grid from 11.2.0.3 to 11.2.0.4 on RedHat
LinuxV5.  I have installed the grid software.  I would now like to install
the latest PSU to the software so that once I upgrade grid I don't have to
take any down time to install the latest PSU.  I have always done this with
the oracle RDMBS and have had no problems.  But I seem to be having trouble
applying the PSU patch to a grid home that is not currently in use.  Has
anyone done this before or can someone give me a high level instructions.


I am also thinking about keeping 2 grid homes on the server.  I will run
grid from one home.   Then when the next PSU patches come out I will apply
them to the grid home not in use.  Once I am ready to push the new PSU out I
will shutdown HAS,  rename the gird homes and start grid back up.  Then I
should be on the new PSU.  Does anyone apply the grid PSU like that?  Is
this a good or bad idea?  What are the problems with this?


Thanks




-- 


------------------------------------------------------------------
This email is intended solely for the use of the addressee and may
contain information that is confidential, proprietary, or both.
If you receive this email in error please immediately notify the
sender and delete the email.
------------------------------------------------------------------

--
//www.freelists.org/webpage/oracle-l


Other related posts: