Re: [foxboro] L02-1 Equipment questions. Was RCNI, NCNI, FO SWITC H

Suggest you check out the latest advisory on connection methods for version
7.0 this is  available on the CSC website

it contains the following Phrases

When adding V7.0 stations to I/A systems using NCNIs: 

Workstations can be added using only NCNI pairs with an RCNI

two workstations can be added using one pair of NCNIs, two RCNIs and a pair
of media converters

A node can be extended using NCNIs and the extra port on each NCNI can be
used to add a workstation. 

This halves the installation cost for 1 (or possibly two (with convertors) )
workstations.

regds






 
 
_______________________________________________________________________
This mailing list is neither sponsored nor endorsed by Invensys Process
Systems (formerly The Foxboro Company). Use the info you obtain here at
your own risks. Read http://www.thecassandraproject.org/disclaimer.html
 
foxboro mailing list:             http://www.freelists.org/list/foxboro
to subscribe:         mailto:foxboro-request@xxxxxxxxxxxxx?subject=join
to unsubscribe:      mailto:foxboro-request@xxxxxxxxxxxxx?subject=leave
 

Other related posts: