Hi Gilly,

I was hoping to write to you before this came out because I was going to
ask if you could make it Thursday instead.
I really want to be there but my wife has two doctor's appointments on
Tuesday that I can't miss.

Rick






On Sat, Jul 3, 2021 at 6:31 PM Thomas Gilsdorf <dmarc-noreply@xxxxxxxxxxxxx>
wrote:

Tuesday, we are having a work party. I would like to start 8:00am . The
extra 2' modules have been attached to the Yard Lead and Bridge modules. We
need to add the track work for these modules.

"Power Plant" Corner. Say farewell to this scenery. It needs to be
carefully packed up. The module needs to be removed and attached to the
Yard Lead.
We will setup one of the existing 4' modules (stored now in the back room)
to the bridge module.
072 right switch needs to be removed from the yard lead. It will be
relocated and reused. The revised track work will consist of two fitter
pieces, a 22.5 degree crossover, the relocated switch and two custom cut
straights.Track work on the expanded bridge module will include two
custom cut straights, and an extension to a siding.

Once the track work is complete, if time permits we can start the
ballasting. We can also arrange buildings on both areas. Wiring will be
done on a separate work session.

Gilly