Re: scheduler jobs not running.

  • From: Don Seiler <don@xxxxxxxxx>
  • To: wndolo@xxxxxxxxx
  • Date: Thu, 6 Apr 2017 12:32:04 -0500

We had an issue previously due to a bug with scheduler windows not changing
if job_queue_processes was set to 0 at the time the change was scheduled.
DB resource manager also played a part in this.

The bug we believe we hit was 22071881, FYI. There are a few patches out
for it.

Don.

On Thu, Apr 6, 2017 at 12:23 PM, Bill Ndolo <wndolo@xxxxxxxxx> wrote:

If you have oracle tools like sql developer or TOAD configured, you can
easily see where the job is broken.
And yes, share logs.

On Thu, Apr 6, 2017 at 12:11 PM, Kellyn Pot'Vin-Gorman <
dbakevlar@xxxxxxxxx> wrote:

What does the log say at the time of the failure?

On Thu, Apr 6, 2017 at 10:10 AM Terrian, Thomas J CTR DLA INFO OPERATIONS
(US) <Tom.Terrian.ctr@xxxxxxx> wrote:

My scheduler jobs stopped running a month ago:

SQL> select JOB_NAME,  NEXT_RUN_DATE from dba_scheduler_jobs where
rownum = 1;

JOB_NAME
------------------------------
NEXT_RUN_DATE
------------------------------------------------------------
---------------
PURGE_LOG
10-MAR-17 03.00.00.100000 AM PST8PDT


Any idea why?

SQL> sho parameter job

NAME                                 TYPE        VALUE
------------------------------------ -----------
------------------------------
job_queue_processes                  integer     1000

--
//www.freelists.org/webpage/oracle-l


--


[image: Kellyn Pot'Vin on about.me]

Kellyn Pot'Vin-Gorman
about.me/dbakevlar
  <http://about.me/dbakevlar>





-- 
Don Seiler
www.seiler.us

Other related posts: