Oracle Failover/Switchover and Streams

  • From: hitender chugh <chughhk@xxxxxxxxxxx>
  • To: oracle freelist <oracle-l@xxxxxxxxxxxxx>
  • Date: Thu, 8 Sep 2011 21:55:44 -0400

We have this Setup
Production Database ----Dataguard ---> Physical Standby
Production Database ----Streams ---> Reporting Database ----- Dataguard ----> 
Physical Standby for Reporting database

The Production database has Physical Standby database and also from Production 
database we have schema level Streams configured to another database for 
Reporting.
Now in case of Switchover/Failover situation to Standby will Streams work 
automatically( or with minimum steps) with Reporting database or we have to 
configure Streams again from New Primary database to Reporting database from 
scratch .i.e. do streams setup and export/import  for both databases.
The two scenarios are listed as below:-
1) In case of Switchover from Production to Standby Physical database will 
streams work seamlessly from New Primary database (old Standby) to Reporting 
database or we have to do the setup of Streams again from New Production to 
Reports database. i.e. what will be steps involved for this?

2) Same question as above in case of Failover to Standby database of Production 
how will the Streams work  from New Primary to Reporting database?

Thanks
Hiten
                                          
--
//www.freelists.org/webpage/oracle-l


Other related posts: