I just got back from the worksite. An emergency contractor has been mobilized
since the two fixes attempted by today's WSSC crew failed. That's why water
came on twice briefly today and went out again. After a 16-hour shift they're
gone. The deep hole has to get deeper, wider and drained so the contractor can
locate, determine and repair the problem. Water hopefully on by morning.
WSSC's emergency water distribution point at the Middle School closed at 11
p.m., slated to reopen in the morning.
Rusty reporter skills came in handy.
Harvey on PB