[north-takoma] Fwd: Update on Small Cell Facility Installation at Philadelphia Avenue and Boston Ave

  • From: Colleen Cordes <ccordes@xxxxxxx>
  • To: north-takoma <north-takoma@xxxxxxxxxxxxx>, Katherine Lambert <president@xxxxxxxxxxxxxx>, LaserBlast <LaserBlast@xxxxxxx>, Diane Svenonius <dbsvenonius@xxxxxxx>
  • Date: Fri, 8 Apr 2022 20:13:21 -0400 (EDT)

See an update below from Daryl Braithwaite, the City's Director of Public 
Works, on that sudden appearance of a wireless facility in a corner of the 
Takoma Horticultural Club's Centennial Garden. 
Thanks so much, Daryl, for your attention and action on this. And thanks to 
Takoma Park resident Katherine Katzin for first noticing and alerting us to 
this installation. -- Colleen 



---------- Forwarded message --------- 
From: Daryl Braithwaite < [ mailto:darylb@xxxxxxxxxxxxxxxx ;| 
darylb@xxxxxxxxxxxxxxxx ] > 
Date: Thu, Apr 7, 2022 at 6:26 PM 
Subject: Update on Small Cell Facility Installation at Philadelphia Avenue and 
Boston Ave 
To: Kate Stewart < [ mailto:kates@xxxxxxxxxxxxxxxx ;| kates@xxxxxxxxxxxxxxxx ] 

, Peter Kovar < [ mailto:peterk@xxxxxxxxxxxxxxxx ;| peterk@xxxxxxxxxxxxxxxx ] 
, Colleen Cordes < [ mailto:cordescolleen@xxxxxxxxx ;| cordescolleen@xxxxxxxxx 
] >, Jamal Fox < [ mailto:Jamal.Fox@xxxxxxxxxxxxxxxx ;| 
Jamal.Fox@xxxxxxxxxxxxxxxx ] >, Jessica Clarke < [ 
mailto:jessicac@xxxxxxxxxxxxxxxx ;| jessicac@xxxxxxxxxxxxxxxx ] > 


Hello All, 
I have been looking into this location to determine the status and whether or 
not Verizon Wireless and their facilitator, N B & C followed required 
procedures. In short, they did not. 

I am still working through the various agencies, but I have been told by 
Montgomery County Tower Committee staff that they have no application for this 
address. I have not yet confirmed whether a County Dept of Permitting Services 
permit was pulled, but I have asked Tower Committee staff to provide me with 
the appropriate contact at DPS. Apparently DPS has enforcement authority and 
the Tower Committee does not, so any action on the County's part would be 
initiated by DPS. 

The applicant did receive a permit from State Highway. That permit was issued 
7/28/21. In reviewing the documents that were included with the SHA permit, it 
appears to me that the location is just outside the State Right of Way and 
within the City right of way. SHA staff have indicated they believe otherwise, 
and I expect to have a follow up conversation with them tomorrow. 

I have reached out to the company that facilitated the project, Network 
Building and Consulting (NB&C) and am in contact with the Project Manager who 
is looking into the record. 

I have also reached out to PEPCO in an effort to determine which office 
installs the meter and to request a delay so the facility can go through the 
required County and City review and permitting process. I am expecting a follow 
up from Pepco on Friday. 

As to actions the City can take, I have asked the City Attorney for guidance. 
At this point it is not clear that the City has authority to issue a Stop Work 
order. I expect to receive more direction from the City Attorney on Friday. 

Special thanks to Colleen Cordes for noticing this facility and calling it to 
our attention. 

As I acquire any new information, I will update. 








-- 
Daryl Braithwaite 
Public Works Director 
(301) 891-7615 
(She, Her, Hers) 

Other related posts:

  • » [north-takoma] Fwd: Update on Small Cell Facility Installation at Philadelphia Avenue and Boston Ave - Colleen Cordes