Hi neighbors!

We're approaching our pool opening day and wanted to give you an update on
where we are with the pool repairs.

We found and repaired a tear in the liner and are in the process of getting
the pool ready for swimming. This has included both the expected cleaning,
heating and balancing of the pool chemicals, as well as a couple of
unexpected repairs. At this point, our goal is still to have the pool open
by our planned opening day of Saturday, May 25th.
<x-apple-data-detectors://0> If we have to delay the opening day due to
chemical imbalances, needed repairs or weather, we will let you know as
soon as possible.

At this point, the wading pool will not be available, as we are having a
new liner installed and unfortunately our rainy spring has delayed this
process. Once the new liner is installed we will get the kiddie pool up and
running as quickly as possible.

Thank you for your patience! We look forward to a fun and safe summer with
you and your families!