[ibis-interconn] IBIS Interconnect Task Group Meeting Minutes - January 19, 2022

  • From: "Justin Butterfield" <dmarc-noreply@xxxxxxxxxxxxx> ("jdbutterfiel")
  • To: "IBIS-Interconnect (ibis-interconn@xxxxxxxxxxxxx)" <ibis-interconn@xxxxxxxxxxxxx>
  • Date: Tue, 25 Jan 2022 15:06:02 +0000

Minutes from the January 19, 2022 IBIS Interconnect Task Group meeting are 
attached.

Regards,
Justin


================================================================================

IBIS INTERCONNECT TASK GROUP
http://www.ibis.org/interconnect_wip/ ;
Mailing list: ibis-interconnect@xxxxxxxxxxxxx 
Archives at //www.freelists.org/archive/ibis-interconn/ ;

================================================================================

Attendees from January 19, 2022 Meeting (* means attended at least using audio)

ANSYS                                Curtis Clark
Intel Corp.                          Michael Mirmak*
MathWorks                            Walter Katz*
Micron Technology                    Justin Butterfield*
                                     Randy Wolff*
Siemens EDA                          Arpad Muranyi*
ST Microelectronics                  Aurora Sanna*
Teraspeed Labs                       Bob Ross*
Zuken USA                            Lance Wang*


Michael Mirmak convened the meeting.  No patents were declared. 
Justin Butterfield took minutes.


Review of Minutes:
- Michael called for review of the minutes from the January 12, 2022 meeting.  
  Michael displayed the minutes.  Lance Wang moved to approve the minutes.  
  Randy Wolff seconded.  The minutes were approved without objection.


Review of ARs:   
- None.

  
Opens:
- Arpad Muranyi suggested to discuss the Designator Pin Relaxation BIRD draft 
  first before the other agenda items.


Designator Pin Relaxation:
Arpad reviewed draft 4 that was sent out with cyan colored changes based on 
feedback from Curtis Clark.  The draft does not include the "NC" change 
proposal yet.  Randy asked if we are considering using "NA" as the 
signal_type.  Arpad replied we would have to establish a special meaning for 
"NA".  Bob Ross commented this would be a new application of using "NA".  

Arpad commented it would be nice to not require all the pins to be listed, but 
should we not allow pins which are not connected to be listed.  Michael asked 
if there were any complaints or feedback on this.  Arpad stated the issue is 
with the efficiency of the EMD files.  Bob commented we need to be careful 
with the rules, as there are many interactions to consider.  Arpad noted one 
issue is that "NC" is not properly defined.  Bob agreed there are multiple 
meanings of "NC" pins.  Randy commented "NC" is a flag to the EDA tool to not 
simulate the pin.  Arpad noted he needs more feedback to make decisions on the 
direction of this BIRD draft.


Touchstone 3:
Walter Katz stated there are many users which have software to read in 
Touchstone files, and many have not updated their software to support 
Touchstone 2.  He suggested to support backward compatibility.  He suggested 
to support machine readable port definitions and sparse matrix format in 
Touchstone 3.

Bob commented our goal for Touchstone was to create an official 
specification.  The objective for Touchstone 2 was not to have backwards 
compatibility with Touchstone 1.  Walter suggested to keep Touchstone 2 and 
Touchstone 3 backward compatibility but not for Touchstone 1.

Walter commented that it seems everyone is okay to go with Touchstone 2 as the 
starting point.  He asked if there are any issues or clarifications for 
Touchstone 2.  Randy suggested to spend some time looking at the survey data.  
Arpad stated file size is one issue.  Bob suggested to drop the Binary Format 
support changes.  Arpad noted the binary format helps to remove the file size 
dependency on the data precision.  Walter commented the half-matrix format 
reduces the file size by a factor of two, and the binary format can reduce the 
file size by another factor of two.

Michael asked if there are any other approaches to compress the files.  Arpad 
suggested the pole-zero format would be a way to significantly reduce the file 
size.  Walter agreed a standard way to represent an S-parameter as a 
subcircuit would be useful, but we can use IBIS-ISS for that.  Michael noted 
one side effect of the pole-zero format is there is not an easy way to 
graphically view the data, such as insertion loss and return loss plots.  
Arpad asked how much people would trust the pole-zero format.  Randy stated 
the pole-zero format will force the data to be causal, and some tools do a 
similar conversion already.  Walter suggested we would have to come up with a 
new name and not have it as part of Touchstone.  Aurora Sanna stated the 
pole-zero format looks like a good option for making models faster, but we 
would need to support both model types.  Arpad noted they convert the 
Touchstone models to pole-zero and that step takes significant time.  

Randy asked if there is a way to reduce ports in the pole-zero format.  Arpad 
will ask Vladimir if it is possible to reduce ports in the pole-zero format 
[AR].

Michael asked everyone to provide their requirements for the pole-zero format 
[AR].


Next Meeting:
The next meeting will be January 26.


Arpad moved to adjourn.  Randy seconded.  The meeting adjourned without 
objection.

================================================================================
Bin List:
1. Touchstone 3
2. Pole-zero support for Touchstone
3. New version of Touchstone to include 3 TSIRDs
4. Clarification BIRD drafts from ATM

Other related posts:

  • » [ibis-interconn] IBIS Interconnect Task Group Meeting Minutes - January 19, 2022 - Justin Butterfield