Minutes are uploaded now. I also changed it from a bare page to one
wrapped in our usual page style.

 

Mike

 

From: ibis-editorial-bounce@xxxxxxxxxxxxx
[mailto:ibis-editorial-bounce@xxxxxxxxxxxxx] On Behalf Of Mirmak, Michael
Sent: Friday, March 04, 2016 11:27 PM
To: ibis-editorial@xxxxxxxxxxxxx
Subject: [ibis-editorial] IBIS Editorial Task Group Meeting Minutes -
March 4, 2016

 

(attaching a text version of the minutes for ease of archiving)

 

======================================================================

IBIS EDITORIAL TASK GROUP

http://www.ibis.org/editorial_wip/ ;

Mailing list: ibis-editorial@xxxxxxxxxxxxx 

Archives at //www.freelists.org/archive/ibis-editorial/ ;

======================================================================

 

Attendees from March 4 Meeting (* means attended at least using audio)

ANSYS
Curtis Clark*

Cadence Design Systems                              Bradley Brim

Cisco
David Siadat

Intel Corp.
Michael Mirmak*

Keysight Technologies                                   Radek Biernacki*

Mentor Graphics                                             Arpad Muranyi*

Micron Technology                                         Justin
Butterfield, Randy Wolff

SAE ITC
Maureen Lemankiewicz, Logen Johnson

Signal Integrity Software                               Walter Katz*, Mike
LaBonte*

Teraspeed Labs                                                Bob Ross*

University of Aveiro in Portugal                  Wael Dghais

 

Michael Mirmak convened the meeting.  No patents were declared.   Michael
summarized the stated objective of the meeting as resolving the use of
"GND" and related terms in the IBIS specification in a consistent manner.

 

Bob Ross stated that the team needed to agree on a process for meetings,
including ground rules. Radek Biernacki agreed, noting that he had
produced a slide set an e-mail on the topic from some months ago.  Walter
noted that he had also produced a slide set, plus a collection of
historical presentations.  He added that voltage statements in the
specification must be followed with statements regarding "in reference to
what".  Bob added that the reference must be defined with respect to
technology, and that's part of the clean-up of the document.  

 

Mike LaBonte suggested that the focus is development of IBIS 6.2, and
believes this will involve the normal process (BIRDs).  The alternative is
to issue specification by fiat.  Walter did not necessarily agree.  A full
IBIS 6.2 can be covered by a single BIRD.  Mike stated he would accept
this if the changes are clear.  Bob suggested a single BIRD is possible if
we minimize the changes.  Technical content might be brought out
separately.  Radek suggested that the work be done in parallel, with
changes made to the specification, extracting that material for editing a
BIRD.

 

Michael asked whether the changes required an opening statement only, or
page-by-page revisions.

Walter suggested both.  Anything that requires parser changes needs close
consideration.  He agrees with Radek - the team may go through the entire
document and extract pages into a separate BIRD.

 

Walter added that no parser changes are expected.  Radek suggested
otherwise.  Walter replied that this assumes Pin Mapping may require
detailed changes.  Bob suggested holding off that discussion until the
terminology is reviewed; that's the key issue.  The team should stabilize
the document as is.  

 

Michael asked four questions

1)      Is a particular IBIS section in need of particular focus, such as
[Model]?

2)      Should the BIRDs be submitted directly from this Task Group?

3)      Would there be any interconnect proposal impact?

4)      Are any other documents affected?

 

Bob, on question (1), noted as an example that the GND symbol is used in a
diagram.  In addition, [Pullup_Reference] may be connected to a terminal
or some other connection.  [Voltage Range] and similar terms in models
need to be clarified.  

 

On question (2), Mike and Radek agree, unless the Open Forum throws them
to a different Task Group for discussion.  Arpad also agrees, but ATM can
bring any issue in as needed.

 

On question (3), Radek stated Interconnect agreed to let GND be resolved
elsewhere. 

 

On question (4), Radek noted that we allow IBIS-ISS to use node 0; this
needs clarification.  

 

Mike asked who shall take minutes in future.  He suggested that, in the
next meeting, the team start a numbered task list or list of recorded
ideas, e.g., change "x" to "y" in every place it appears.  The team needs
a working document to maintain, that forms our institutional memory.  Bob
replied that a working document would be separate, and that a review
page-by-page would still be required.  We might limit scope to exclude the
EMI section, for example.  Mike replied that grounding could be
particularly important there.

 

Radek stated that we may go page by page, or in groups of pages; we can
search the document for different things rather than sequentially.  On a
task list, he sent an e-mail months ago suggesting a number of tasks.
Mike agreed.  

 

Walter asked that Mike upload to one location all his relevant reference
documents.

 

Radek reviewed his slides.  Key points:

-          There's a silent assumption of global reference in [Model]

-          Global node zero is OK to use as a reference

-          IBIS-ISS subcircuits support use of global node zero

 

Two total pages of topics included: global node 0, nodes for C_comp
connection, impact of different pulldown and GND clamp reference, non-zero
pulldown/GND references and signal I/O reference node with or without pin
mapping?  Pulldown_ref bus declarations with pin mapping?  

 

Bob suggested that Pin Mapping not be touched by this discussion.  Walter
agreed, noting that several issues were resolved in separate
presentations/discussions. 

 

Mike accepted an AR to produce the task list for review at next meeting.  

 

Walter moved to meet twice out of every 3 weeks, when the IBIS Open Forum
is not meeting.  Arpad asked about duration.  Walter stated that 1 hour,
meetings to exclude holidays.  Radek seconded the motion.  No objections
were raised.

 

Walter presented his slides on referencing, including on VDD-relative and
Vcc-relative connections.  He suggested that Vcc-relative means that
voltages are referenced to the Vcc pin, as is stated in the [POWER Clamp
Reference] keyword.  The standard equation involves Vtable = Vcc -
Voutput.  Similar language is proposed for "GND pin" under [GND Clamp
Reference].  Test fixture concepts are involved here, so the proposed text
adds Device in Action and Device Under Test concepts.

 

For next time, Vinl and Vinh will be addressed.  Bob objected to adding
the new concept of a VCC pin.  

 

Walter moved to adjourn.  Curtis Clark seconded.  The meeting adjourned.

 