They have only pulled the primary fibre cable in to Delph drive I believe. 
Most of the ducts on Heathfields have been proven to be open and have capacity 
to have fibre blown down them.
As Neil suggests we need to be patient but I suspect we will see much more 
progress over the next couple of months.
I'm hoping to have service by late Spring but wouldn't bet my mortgage on it.
Steve


Sent from my Samsung Galaxy smartphone.
-------- Original message --------From: nmb@xxxxxxxx Date: 09/01/2019  17:40  
(GMT+00:00) To: heathfields@xxxxxxxxxxxxx Subject: [heathfields] Re: BT When 
and Where Checker 
Hi Andy, I don’t have any update myself. As I’m not on the contract personally 
I’m as much in the dark as everyone. I don’t get updates. However, reading the 
When & Where sites. It mentions that “Once the engineering work is completed 
there is a commissioning period of up to eight weeks before an order can be 
placed”. Whilst we don’t know when the engineering work will be complete, we do 
know it’s started. I would take the conservative guess that we are looking at 
AMJ period. Hopefully nearer to April than June. I stress it’s just a guess on 
my part. What we do know is that the contract is they have to be complete by 
July, and that the work is taking place.  We’ve just got to sit tight and wait 
for a few more months, that’s all.  Neil From: heathfields-bounce@xxxxxxxxxxxxx 
<heathfields-bounce@xxxxxxxxxxxxx> On Behalf Of Andy Marshall
Sent: 09 January 2019 16:57
To: heathfields@xxxxxxxxxxxxx
Subject: [heathfields] Re: BT When and Where Checker Hi Neil, Have we heard 
anything else in terms of timeline? I know they have pulled fibre through the 
ducts in early December. Regards Andy Sent from my iPhone
On 29 Sep 2018, at 08:37, Neil Brown <heathfields@xxxxxxxxx> wrote:For those of 
you who don’t [or never] check the BT When & Where Fibre Broadband page. It is 
now listing that our Exchange and Cabinet is in scope for FTTP installation.  
The checker states that it doesn’t update for FTTP builds. If I were to pin a 
flag on the chart though I would say we are at the Field Survey stage from the 
small amounts of information that I’ve picked up. Although the checker hasn’t 
been the most accurate measure of progress in the past, I do find it comforting 
that they now state FTTP for us 😊 If the picture doesn’t come through on email 
for you, the checker is available through this link: 
https://www.homeandbusiness.openreach.co.uk/fibre-broadband/when-can-i-get-fibre
 Neil ++++ Message Scanning REF:365-avs1-1538206609 ++++


This email and any attachments to it may be confidential and are intended 
solely for the use of the individual to whom it is addressed. Any views or 
opinions expressed are solely those of the author and do not necessarily 
represent those of Ina4 Media Limited. If you are not the intended recipient of 
this email, you must neither take any action based upon its contents, nor copy 
or show it to anyone. Please contact the sender if you believe you have 
received this email in error. 

Company Registered in England & Wales, Company Reg. No. 04506907, VAT Reg. No. 
GB 801 4604 72

Other related posts: