Please remove me from the distribution list since my son is no longer interested. I hope you're having a good day! Thanks! Tamara (Tammie) Rush Sent from my iPhone > On Jun 21, 2014, at 7:17 AM, Wyatt Jordan <wyattwoo@xxxxxxxxx> wrote: > > The order of this list won't really work. The programming team can't program > and test code before Joseph finishes the clutch, also putting the arm on for > the first pitch is unnecessary, we just manually load the ball > > -Wyatt Jordan > > >> On Fri, Jun 20, 2014 at 10:42 PM, Redacted sender camyandty@xxxxxxx for >> DMARC <dmarc-noreply@xxxxxxxxxxxxx> wrote: >> >> Congratulations to our new Team Captains: >> >> Team Captain - Jared Wagner >> Co-Captain – Jonathan Ciavolino >> Tech Captain – Joseph Haire >> Media Captain – Ashley Amundsen >> Safety Captain – Kenny Proctor >> Business Captain – Ananya Tripathi >> +++ >> Important meeting next Tuesday, June 24th – Prepare blAZE to throw a game >> ball >> 6:30 pm Captains Meeting >> 6:45 pm Team Assignments from the Captains >> 7:00 pm Mentor Meeting >> 8:45 pm Pack van for First Pitch >> 8:55 pm Recap the evening >> 9:00 pm lock up building >> +++ >> Teams for the night, Tuesday, June 24th >> 1 Controller Team >> 1.1 Determine minimum wiring needed to have blAZE shoot and rewind >> 1.2 Do the wiring to the control module >> 1.3 Set up joysticks and wireless >> 1.4 Connect the control module to blAZE and test >> 1.5 Assemble the control module to blAZE >> 1.6 Test again >> 2 Programming Team >> 2.1 Determine minimum program needed to have blAZE shoot and rewind >> 2.2 Write the program >> 2.3 Test the program >> 3 Clutch Team >> 3.1 Identify what is left to make for the clutch >> 3.2 Make parts – This may need to be completed off-site (Not in the >> STEM Center) after Tuesday >> 3.3 Assemble >> 3.4 Test >> 3.5 At 8:30 pm Assess progress and develop completion plan >> 4 Ball Retriever Team >> 4.1 Assess what is minimal to have a non-functional arm attached to >> blAZE >> 4.2 Reassemble the retriever arm >> 4.3 Attach the arm to blAZE >> 4.4 Attach bumpers and misc. >> 5 Logistics Team >> 5.1 Find out who is going to First Pitch and make a list >> 5.2 Assign 4 Folks to carry out blAZE for First Pitch >> 5.3 Assign 2 Folks on drive team for First Pitch >> 5.4 Others to carry banner, cards or? Where to stand on field. What to wear. >> What to do. >> 5.5 Photography and write up >> 5.6 List of items to go >> 5.7 Find items to take and que up >> 5.8 Inflate Game Ball >> 5.9 When to arrive. Where to meet, etc. >> +++ >> Next Event: First Pitch Ripken Stadium July 1st 7:00 pm >> >> Dr. Tyrone D Schwenk DMOL, MSTM, MSSE, BSES, BSME, BAGA >> R6σ Specialist >> ENGINEERING >> Space and Airborne Systems >> Raytheon Company >> >> +1 443.558.5394 (office) >> +1 443.876.5199 (cell) >> +1 443.558.5877 (fax) >> Tyrone_D_Schwenk@xxxxxxxxxxxx >> >> Advanced Communications and Countermeasures >> 6260 Guardian Gateway >> Aberdeen Proving Ground, MD 21005 USA >> www.raytheon.com >> >> “... you just can't differentiate between a robot and the very best of >> humans,” Isaac Asimov, I, Robot. >> >> Follow Raytheon On >> <mime-attachment.gif> <mime-attachment.gif> <mime-attachment.gif> >> <mime-attachment.gif> <mime-attachment.gif> >> >> <mime-attachment.gif> >> >> This message contains information that may be confidential and privileged. >> Unless you are the addressee (or authorized to receive mail for the >> addressee), you should not use, copy or disclose to anyone this message or >> any information contained in this message. If you have received this message >> in error, please so advise the sender by reply e-mail and delete this >> message. Thank you for your cooperation. > > > > -- > > -Wyatt Jordan