Re: [foxboro] CSA_Save

  • From: Duc M Do <duc@xxxxxxxxxx>
  • To: foxboro@xxxxxxxxxxxxx
  • Date: Thu, 28 Apr 2016 23:07:30 -0400

Joe,
On my system at Dow Corning, in addition to the BESR/SSR backup of all the
workstations as a matter of course, I also run CSA_Save every weeknight on
the CSA server (since we're always in the ICC mucking with the control
databases) just so I can sleep soundly. I roll up all the files created by
CSA_Save (one per control station) into a tar ball and name it with the
time and date. With these and the change tracking in Foxray, we are
confident it'll take multiple of multiple failures before we're brought to
our knees. (Let's hope Murphy doesn't get me for that boastful statement.)

Duc

On Thu, Apr 28, 2016 at 9:50 PM, Joseph M. Riccardi <Joe@xxxxxxxxxxxxx>
wrote:

Last chance to comment on my CSA_Save plan before I do something stupid
Friday...  :-)


Joseph M. Riccardi
386-451-7607 Cell

Joe@xxxxxxxxxxxxx

"To give real service you must add something that cannot be bought or
measured with money; and that is sincerity and integrity." - Donald A.
Adams


-----Original Message-----
From: foxboro-bounce@xxxxxxxxxxxxx [mailto:foxboro-bounce@xxxxxxxxxxxxx]
On
Behalf Of Joseph M. Riccardi
Sent: Wednesday, April 27, 2016 10:37 AM
To: foxboro@xxxxxxxxxxxxx
Subject: Re: [foxboro] SCSI problems; now CSA_Save

Or would saving the entire /opt/fox/csa folder be a better approach?


Joseph M. Riccardi
386-451-7607 Cell

Joe@xxxxxxxxxxxxx

"To give real service you must add something that cannot be bought or
measured with money; and that is sincerity and integrity." - Donald A.
Adams


-----Original Message-----
From: foxboro-bounce@xxxxxxxxxxxxx [mailto:foxboro-bounce@xxxxxxxxxxxxx]
On
Behalf Of Joseph M. Riccardi
Sent: Wednesday, April 27, 2016 10:20 AM
To: foxboro@xxxxxxxxxxxxx
Subject: Re: [foxboro] SCSI problems; now CSA_Save

Same site, same AW70 WinNT Node; different question... CSA_Save.  I built a
clone Node for use as a development and testing Node, disconnected from the
production Node.  We try to keep the 2 Nodes in synch but I have always
been
concerned with the ICC workfiles and the CPs getting out of synch.  Is the
CSA_Save utility intended to be used as a preventative measure?  If I
understand how it works it is useless once the ICC workfiles and the CPs
are
out of synch.  My plan has been to periodically run CSA_Save and back up
those files, just in case.  Is this the intent of CSA_Save?  If it is, I
cannot see why this procedure would not be in everyone's periodic
maintenance procedure, just in case?  What am I missing?

And I just want to make sure running it will not cause any problems on
existing host's CSA files.

Thanks


Joseph M. Riccardi
386-451-7607 Cell

Joe@xxxxxxxxxxxxx

"To give real service you must add something that cannot be bought or
measured with money; and that is sincerity and integrity." - Donald A.
Adams





 
 
_________________________________________________________________________
This mailing list is neither sponsored nor endorsed by Schneider Electric
(formerly The Foxboro Company).  Use the info you obtain here at your own
risks.  See the disclaimer at www.thecassandraproject.org/disclaimer.html
 
foxboro mailing list:               //www.freelists.org/list/foxboro
to subscribe:           mailto:foxboro-request@xxxxxxxxxxxxx?subject=join
to unsubscribe:        mailto:foxboro-request@xxxxxxxxxxxxx?subject=leave
 

Other related posts: