[foxboro] Calculations

  • From: "Gillis, Dale" <Dale.Gillis@xxxxxxxxxxxxxxx>
  • To: "'foxboro@xxxxxxxxxxxxx'" <foxboro@xxxxxxxxxxxxx>
  • Date: Tue, 14 Jun 2011 10:23:13 -0500

Hello List

Just wondering if any one has done something similar to the following?
I've been asked to:

Program a calculation block to calculate the 3 minute arithmetic average of 
instantaneous opacity reading and send this average to PI. (this is 3 minute 
block average not rolling average).  Create an alarm if the arithmetic three 
minute average (block not rolling average) is 20% or above for more than 4 
minutes in any 30 minute period. (2 peaks of 4 minute average in a 30 minute 
period). Alarm banner to state "Opacity Exceedence.....  log Exceedence"

I was thinking of using a calca block and maybe a DTIME block.  Any ideas?

Thanks in advance

Dale

This electronic message contains information from NewPage Corporation or 
subsidiary companies, 
which may be confidential, privileged or otherwise protected from disclosure. 
The information is 
intended to be used solely by the recipient(s) named. If you are not an 
intended recipient, be 
aware that any review, disclosure, copying, distribution or use of this 
transmission or its 
contents is prohibited. If you have received this transmission in error, please 
notify NewPage 
immediately at postmaster@xxxxxxxxxxxxxxxx

 
 
_______________________________________________________________________
This mailing list is neither sponsored nor endorsed by Invensys Process
Systems (formerly The Foxboro Company). Use the info you obtain here at
your own risks. Read http://www.thecassandraproject.org/disclaimer.html
 
foxboro mailing list:             //www.freelists.org/list/foxboro
to subscribe:         mailto:foxboro-request@xxxxxxxxxxxxx?subject=join
to unsubscribe:      mailto:foxboro-request@xxxxxxxxxxxxx?subject=leave
 

Other related posts:

  • » [foxboro] Calculations - Gillis, Dale