A closure of Runway 4/22 has been planned for 3 days beginning July 24 to 
complete the approach end of Runway 4 to its finished length. This date could 
change due to weather or contractors scheduling. If wind direction allows, 
departures should be able to take place on Runway 4 at A2 on the 24th up to the 
time work begins around 7AM, and possibly at times while work is being done if 
construction equipment is far enough back from A2. No departures will be 
allowed from Runway 22 toward the construction equipment, and no landings will 
be allowed until the runway is reopened due to the possibility of landing short 
or overrunning long into the construction equipment.

If dates or times change, I will send out a notification when I confirm the new 
information.

Thank you,
John Thompson