From: Littlehampton Harbour [mailto:harbour=littlehampton.org.uk@xxxxxxxxxxx] ;
On Behalf Of Littlehampton Harbour
Sent: 05 September 2023 15:40
To: Andrew Hubbard <janda@xxxxxxxxxxxxxxxx>
Subject: Local Notice 21 of 2023: Reconstruction of West Wall at Harbour 
Entrance

 


                


  <http://i1.cmail19.com/ei/r/25/7F9/22B/003719/csfinal/lhb-logo_NEW.jpg


LOCAL NOTICE TO MARINERS No. 21 of 2023

Reconstruction of West Wall at Harbour Entrance

MARINERS ARE ADVISED that a 40-metre length of the harbour entrance’s timber 
west wall is shortly to be reconstructed by LHB’s appointed contractors, 
Teignmouth Maritime Services, who will be working from West Beach from 11th 
September to approximately 20th November 2023. The area being reconstructed is 
at 50°48.0' N 000°32.5' W and can be easily identified as the first 40m of 
timber wall to seaward of where the wall’s structure transitions from concrete 
to timber and also where the Shoal Bank seasonally accumulates through shingle 
overtopping from West Beach.

  
<http://i1.cmail19.com/ei/r/25/7F9/22B/003719/csfinal/LNTM21image-990514079e028a3c.png>
 

Teignmouth Maritime Services are constructing a new wall formed of tubular 
steel piles and a combination infill of steel sheet piles and concrete panels 
using an 80-tonne crawler crane, a piling gate and other plant working from the 
West Beach. The works will not involve a barge within the river so the harbour 
entrance should remain open. This includes commercial shipping subject to 
pilotage (although temporarily under stricter weather and size limits).

An 8m wide Exclusion Zone will be in force on the west side of the river for 5 
weeks between 20th September to 24th October 2023 to ensure the safety of 
vessels as well as site workers whilst plant, personnel and temporary 
structures extending a few metres riverward. During this period, the north and 
south extents of the working area will have flashing orange site lights 
overnight. Mariners are also advised that, once constructed, the new wall will 
extend approximately 2 metres further into the channel than existing at capping 
level.

In the meantime, harbour users are reminded that this 1920s timber structure is 
at end of life, has already had various major repairs in recent years and is 
increasingly fragile to damage caused by weathering, overbearing shingle and 
accidental damage caused by both passing vessels and plant carrying out 
essential dredging. Until replaced there remains a risk the structure could 
collapse. Therefore, as already advised by  
<https://email.tannwestlake.com/t/r-l-ttkhthkk-bujhukyilu-r/> Standing LNtM 02 
of 2023, as well as the hereby replaced LNtM 03 of 2023, mariners are advised 
to continue to give this area a wide berth by transiting this area using the 
eastern side of the channel. If the channel is busy, mariners are advised to 
keep a keen watch, plan ahead and reduce speed or stop (where tide allows) in 
order to avoid passing or overtaking within 50 metres of this area. Right of 
way should be given to those navigating with the tide and therefore have less 
control of speed and course.

The adjacent part of West Beach remains closed to the public with access to the 
beach continuing to be via the Dunes Boardwalk until the project is complete. 
During construction, available parking in the lower part of West Beach Carpark 
will be reduced by 20 spaces on weekdays and 14 spaces at weekends. There is 
more information on the Harbour Entrance Renewal Scheme here:  
<https://email.tannwestlake.com/t/r-l-ttkhthkk-bujhukyilu-y/
www.littlehampton.org.uk/harbour-entrance

Owners, Agents, Charterers, Marinas, Yacht Clubs and Recreational Sailing 
Organisations should ensure that the contents of this Notice are made known to 
the Masters or persons in charge of their vessels or craft.  

Mike Hayes

Harbour Master

5th September 2023

A two-page printer-friendly A4 version of this notice is available  
<https://email.tannwestlake.com/t/r-l-ttkhthkk-bujhukyilu-j/> here.

 


 <https://email.tannwestlake.com/t/r-l-ttkhthkk-bujhukyilu-t/>  
<https://email.tannwestlake.com/t/r-l-ttkhthkk-bujhukyilu-i/>  
<https://email.tannwestlake.com/t/r-l-ttkhthkk-bujhukyilu-d/

 


        
 <https://email.tannwestlake.com/t/r-fb-ttkhthkk-bujhukyilu-o/>   Share  

 <https://email.tannwestlake.com/t/r-tw-ttkhthkk-bujhukyilu-b/>   Tweet  


Littlehampton Harbour Board
Harbour Office

Pier Road

Littlehampton

West Sussex

BN17 5LR

01903 721215

 <https://email.tannwestlake.com/t/r-u-ttkhthkk-bujhukyilu-n/> Unsubscribe 

  

 

  
<https://littlehamptonharbourboard.cmail19.com/t/r-o-ttkhthkk-bujhukyilu/o.gif

JPEG image

Other related posts:

  • » [budc] FW: Local Notice 21 of 2023: Reconstruction of West Wall at Harbour Entrance - Andrew Hubbard