Gwynne just gave a speech in C Springs today in which she said cost of
refurbishment was about half the cost of new, and that she expected
less rework in the future.

On Wed, 2017-04-05 at 14:02 -0400, Henry Spencer wrote:

On Tue, 4 Apr 2017, William Valliant wrote:
I saw that SpaceX re-flew a first stage and I was wondering if they
fared
any better that the STS did? I remember that the SSME's turned out
to
require complete overhauls and that the TPS took a bunch of work as
well.

The shuttle SRBs are probably a fairer comparison.  Despite the PR
hype, 
the SRBs weren't so much re-used, as salvaged -- that is, they were 
stripped down to parts and some of the parts were used to build
later 
SRBs.  (Much like SpaceX's original re-use concept, in fact...!) 
The 
casings mostly got re-used, but there was a lot of other hardware --
each 
SRB had its own hydraulic system, its own APU to drive the
hydraulics, its 
own electronics packages, etc. etc. -- and after every flight it all
got 
torn down, inspected, worked on, and then considered for re-use. 
The 
whole thing was very labor-intensive and it's not clear that it ever 
really saved NASA any money.

SpaceX *probably* is doing better than that.  But anybody who knows
the 
details of how much refurbishing that stage needed, isn't talking
yet. 
They may say a bit more about it after they've done this a few times
and 
have sorted out what first-stage mods are needed to improve it
(almost 
certainly there will be some) and which things really are going to
need 
attention every time.