[rollei_list] Re: Repair wait, was: Maxwell screen for my 2.8E?
- From: Jan Decher <Jan.Decher@xxxxxxx>
- To: rollei_list@xxxxxxxxxxxxx
- Date: Fri, 25 Aug 2006 08:49:29 -0400
Very true. But nothing compared to H. Scherer. My Super Ikonta is in
the 10th month with him on sth. like place 18 in his queue (sent last
October). If I am lucky I will have in November. It's okay as long as
you are prepared for it. You can even reserve a space on his waiting
list for a Contax etc. while you are still using it.
We should start a foundation to train some new repair people with these
last great masters...;-)
Jan
====
On Friday, Aug 25, 2006, at 02:02 America/New_York, FreeLists Mailing
List Manager wrote:
Date: Thu, 24 Aug 2006 10:29:38 -0500
From: Jeffery Smith <jls@xxxxxxxxxx>
Subject: [rollei_list] Re: Maxwell screen for my 2.8E? Should I do
This is why it is necessary to have more than one Rolleiflex and more
than one Leica. Fleenor takes 3-4 months with a Rollei, and DAG takes
3-4 months with a Leica. There just aren't enough of those guys out
there. Bill Maxwell took so long with my Rollei, I wrote to him and
told me to send it back!
---
Rollei List
- Post to rollei_list@xxxxxxxxxxxxx
- Subscribe at rollei_list-request@xxxxxxxxxxxxx with 'subscribe'
in the subject field OR by logging into www.freelists.org
- Unsubscribe at rollei_list-request@xxxxxxxxxxxxx with
'unsubscribe' in the subject field OR by logging into www.freelists.org
- Online, searchable archives are available at
http://www.freelists.org/archives/rollei_list
- Follow-Ups:
- [rollei_list] Re: Repair wait, was: Maxwell screen for my 2.8E?
- From: Kenneth Frazier
Other related posts:
- » [rollei_list] Re: Repair wait, was: Maxwell screen for my 2.8E?
- » [rollei_list] Re: Repair wait, was: Maxwell screen for my 2.8E?
- » [rollei_list] Re: Repair wait, was: Maxwell screen for my 2.8E?
Date: Thu, 24 Aug 2006 10:29:38 -0500 From: Jeffery Smith <jls@xxxxxxxxxx> Subject: [rollei_list] Re: Maxwell screen for my 2.8E? Should I do
This is why it is necessary to have more than one Rolleiflex and more than one Leica. Fleenor takes 3-4 months with a Rollei, and DAG takes 3-4 months with a Leica. There just aren't enough of those guys out there. Bill Maxwell took so long with my Rollei, I wrote to him and told me to send it back!
--- Rollei List
- [rollei_list] Re: Repair wait, was: Maxwell screen for my 2.8E?
- From: Kenneth Frazier