Is there a difference in the execution plans? Can you trace the sessions? Harel Safra Sent from my phone. On Apr 26, 2011 12:51 AM, "Stephen Andert" <andert@xxxxxxxxx> wrote: > Yes, it is on a SAN. Not sure what other machines may be doing at the same > time, but even when the CM job and the TOAD job are run at the same time, > the TOAD job runs faster. > On Mon, Apr 25, 2011 at 2:52 PM, Stephane Faroult <sfaroult@xxxxxxxxxxxx >wrote: > >> Running on a SAN and other machines connected to the same computing their >> stats at the same time? >> >> Stephane Faroult >> RoughSea Ltd <http://www.roughsea.com> >> Konagora <http://www.konagora.com> >> RoughSea Channel on Youtube <http://www.youtube.com/user/roughsealtd> >> >> On 04/25/2011 10:51 PM, Stephen Andert wrote: >> >> Do you have any ideas on why this would run in Toad in 2 minutes and take >> over 4 hours running through the concurrent manager? Actually up until >> this past week, 4 minutes is the usual run time for this job. >> >> >> I have looked at StatsPack for one of the 4 hour runs and other than >> about 75% of the time being I/O related. did not see anything out of line. >> >> >> Financials 11.5.8 >> >> DB 9.2.0.4.0 >> >> (what am I missing?) >> >>