RE: Oracle issue with Ultrasparc CPU's

  • To: <oracle-l@xxxxxxxxxxxxx>
  • Date: Tue, 18 Jul 2006 13:08:46 -0700

        
        
        I have experienced going from 12 Cpu SMP to 4 CPU Numa and 4 was
better though much of the improvement was most likely due to the fact we
also replaced the disk farm from 150 small disks to 16 disks in an EMC
unit.  On the old system 2.5 hours to rebuild one index.  On the new
system 15 minutes.


Interesting. A 10x improvement. It seems reducing your physical platters
by 90%
would get you that. Could it me that there is actually a dramatic
reduction in
physical I/O ?

What is a 4 CPU Numa BTW?

--
//www.freelists.org/webpage/oracle-l


Other related posts: