And jumpstarter fixes

On Thursday, February 20, 2014, Armor Harris <armorharris@xxxxxxxxx> wrote:

> Hey guys,
>
> Here are the remaining delta's to cold flow. Underlined items are the ones
> we need to happen before we can do the dry run tonight. I'll be back in the
> lab between 5 and 6 I'd like to do the dry run at 9pm.
>
> *Electronics:*
> *Fix GSE software reliability bugs*
> *Forward end avionics bay assembly*
> *Pressure transducer on ground nitrous supply tree*
> Figure out why pressure transducers diverge at higher pressures
> Re-tare N2O load cell
>
> *GSE:*
> *Move ULD disconnects to new hoses*
> Pre-assemble as much of the test stand guy wires as possible
> Test stand assembly
> *ULD assembly*
>
> *Rocket:*
> Pyro valve assemble
> Pryo vavle bay weatherproofing
> *Foam nitrogen tank support ring install*
> Frozen charge test
>