[birdky] TVA lake level study

  • From: Elizabeth.Ciuzio@xxxxxx
  • To: birdky@xxxxxxxxxxxxx
  • Date: Mon, 5 Apr 2004 15:10:12 -0400

Dear KOS,

The final EIS on the TVA Reservoir Operation Study came out a few weeks ago.
The preferred alternative is a combination of elements from the various
alternatives outlined in the draft EIS. The final EIS is still open for
comments (until April 12, 2004). The final EIS is a long and confusing
document. But there are 2 files on the web that are easily and quickly read.
If you are interested, I suggest you visit this site:
http://www.tva.gov/feature_rostudy/index.htm.

Then scroll down and follow the 'final environmental impact statement fact
sheet' link (Adobe file, 2 pages). This gives a good overview of how the
preferred alternative will impact the entire project. After you read or
print this, hit the back button and go to the 'Reservoir fact sheets' link.
Scroll down to the 'Kentucky' link (Adobe file, 2 pages). This file tells
you how KY specifically will be impacted by the preferred alternative.

Basic points under the preferred alternative:
1. KY and Barkley lake level management is not supposed to change. There
will be a change in the draw down regime of tributary reservoirs. Basically,
they will try to extend summer pool in tributary reservoirs until Labor Day.
However, they will do a draw down if it is necessary to meet minimum flow
requirements.

2. Continuous minimum flow of 25,000 cfs will be provided at Kentucky Dam to
better maintain a minimum tailwater elevation of 301 feet and a 12-foot
navigation channel below Kentucky (should not be a big impact).

3. The public is invited to review and comment on the final Environmental
Impact Statement (FEIS)
for TVA's Reservoir Operations Study during a 45-day period continuing
through April 12, 2004.
Comments may be submitted by accessing the ROS web site at www.tva.com/ros;
by mail to TVA
Reservoir Operations Study, WT 11A, 400 West Summit Hill Dr., Knoxville, TN
37902; or by fax to 865-
632-3146. If you would like more information, please call TVA toll-free at
888-882-7675.
The TVA Board of Directors is expected to make a decision in late spring
2004 about whether to
change TVA's reservoir operating policies.

Even though the preferred alternative is to not change the lake levels in
KY, there is still pressure on TVA to extend summer pool. If you have an
opinion on this topic, I encourage you to submit your comments between now
and April 12.

Sincerely,
Elizabeth Ciuzio
Wildlife Biologist

KDFWR
#1 Game Farm Road
Frankfort, KY 40601-9986
Toll Free line: 1-800-858-1549

> Confidentiality Notice:
> This e-mail message, including any attachment, is for the sole use of the
> intended recipient(s) and may contain confidential information. Any
> unauthorized review, use, disclosure or distribution is strictly
> prohibited. If you are not the intended recipient, please contact the
> sender, by e-mail, and destroy all copies of the original message.
> 
> 
================NOTES TO SUBSCRIBERS==============

The BIRDKY Mailing List requires you to sign 
your messages with first & last name, city, & 
state abbreviation.
--------------------------------------------------
To post to this mailing list, send e-mail to:
birdky@xxxxxxxxxxxxx
-------------------------------------------------- 
To unsubscribe, send e-mail to:
birdky-request@xxxxxxxxxxxxx 
with 'unsubscribe' in the Subject line.
* * * * * * * * * * * * * * * * * * * * * * * * *  
Visit the Kentucky Ornithological Society
web site at http://www.biology.eku.edu/kos.htm
* * * * * * * * * * * * * * * * * * * * * * * * * 
BIRDKY List Manager: Gary Ritchison, Richmond, KY
E-mail: gary.ritchison@xxxxxxx

Other related posts: