[amayausers.com] Re: Clamping Systems

  • From: webmaster@xxxxxxxxxxxxxx
  • To: amayausers@xxxxxxxxxxxxx
  • Date: Wed, 19 Sep 2007 14:51:14 UT

This message was posted by signman on AmayaUsers.com. PLEASE DO NOT REPLY VIA 
EMAIL. Instead, respond to the thread on the WEBSITE by clicking here: 
http://www.amayausers.com/boards/ultimatebb.php?/topic/1/173.html#000011

Just an update on how good the slim line clamp works...we are finishing up a 
small run- 15 large tote bags (Sanmar #BO75)
3 lines of type, .6" high, one color-almost the width of the 6" 'window' frame.
NO backing, no underlayment. All we did is stick the handle loop
through the frame, under the bobbin snout, then pull the tote up to the edge of 
the frame assembly and clamp it-lined up perfectly.
Average 4.5 minutes each to sew, about 1 minute to take one off and get the 
next one ready.
No trimming between letters, and we're down to the last one-not one single 
thread break! Lettering density is 4.3, no backing. Needles are turned 
slightly, pull comp 105.
I would 'guess' if we used a round hoop like we used to- about 10 minutes to 
change over, hoop, line up?
Started about 1 hour ago and have been running without stopping. I'd say total 
time, including setup and test sewout, will be about 1 3/4 hours. 15 totes for 
local school office, retail price with 5,000 stitches- $141.40.
So the right clamp system can MAKE you money fast!
Roland

=========================================================== 

The AmayaUsers Mailing List
Website: http://www.amayausers.com
Discussion Board: http://www.amayausers.com/boards
Subscribe/Unsubscribe: http://www.amayausers.com/list

=========================================================== 

Other related posts: