Chief Engineer's Log, Stardate 0411.16. My crews have been working double and triple shifts since the Spaculan test ship exploded forcing us out of slipstream. The Eagle has suffered moderate damage across all decks. We have restored life support, and most secondary propulsion systems. Communications, all defense systems, long range sensors, and both warp and slip stream drive systems are still down. Mr. Haas is currently working with one of my best teams to try and restore communication and I think they will have better luck then I am with the warp and slip stream drives. Most of the conduits surrounding the core have been slagged. And according to tricorder readings most of the Magnetic Constriction emitters are fused because of the power feedback when we exited slipstream. With replicators still down, I am not sure if we will be able to restore slipstream but I am hopeful that we can restore at least partial warp power. It's a long shot but one that we have to take. End log. Lieutenant Jeff Dawson Acting Chief Engineer USS Eagle; NCC-9561