[SI-LIST] SI applications engineer opening in Dallas TX

  • From: "Jackie" <jackiejackson@xxxxxxxxxxxxx>
  • To: <si-list@xxxxxxxxxxxxx>
  • Date: Thu, 21 Jan 2010 15:57:07 -0600

I am wking with an EDA company that is looking for someone with SI analysis
experience either on die or between package and die to support their tool in
this area.

Please call me or email me if you would like more information on this
opportunity.

Regards,

Jackie Jackson
jackie@xxxxxxxxxxxxxxxxx
www.edarecruiting.com
888-748-3941



-----Original Message-----
From: si-list-bounce@xxxxxxxxxxxxx [mailto:si-list-bounce@xxxxxxxxxxxxx] On
Behalf Of Marc Humphreys
Sent: Thursday, January 21, 2010 3:07 PM
To: Surita Chandani; si-list@xxxxxxxxxxxxx
Subject: [SI-LIST] Re: [Possible SPAM] BGA Breakout.

Surita,

Now lets get to solving your 2 between math problem. I assume at this point
you've read and gathered valuable insight from Lee's depiction of the
anatomy of a via structure and related feature terminology from his
webposting "Why Not Route Two Traces Between Pins on a 1 mm Pitch BGA?. 

" Yes I've read that book. Your conclusions are all ... :-) Captain, another
missile. ...pause...Tell me.. " from the movie Hunt for Red October. 

Not lauching missiles here and not intending to start are war. Surita still
doesn't have his answer.

Lee, can't argue the conclusion just your presumed assumptions and unstated
facts on current fab DFM guidelines from top tier Fab. vendors. I think you
said as much in a follow up e-mail this morning.

So on we go...
 The pad for the BGA ball along with its 35 mil antipad etc. are not the
numbers you need to worry yourself with for the solving the two between
breakout of a 1mm BGA. Is just the via padstack that comes into play here.

First off we have to assumes we're not trying to esacpe on the top layer. 
Even single lines more than 2 row deep will problably stretch even the top
tier fab. houses DFM rules. as they typically want you to maintain a minimum
5 mil pad to line and min 5 mil min outer layer traces)

So considering the inner layers of the brd only.
The via size for the brd has to maintain a maximum 10:1 or 12:1 ratio (
drill size to via length) Can go higher but no for the small drill sizes
neccessary for this practice.
From experience the numbers work fine if we start with a 10mil drill size. 
which allow us to confidently build boards upto 120mil thick. 

All number are in mils. after initial convertion of 1mm to 39.37mils.

So the pitch between BGA pads is 1mm = 39.37mils. 
Assuming we keep the same grid for the vias were have 39.37 mils center to
center on the drill.
A 10 mil drill/ 20 mil pad and allowing a  pad to line of 4 mils - typical
number for a top tier fab.
will leave you with a usable routing channel just over 11mils.
Allowing 4 mils between traces you can now run two 3.5 mil lines.

If high voltage isoalation is required these dimensions will not work.

Also to prevent breakout on the pads you should add or request your fab
vendor to add Teardrops or fillets to your pad connections.

Marc

----------------------------------------
 From: "Surita Chandani" <surita.chandani@xxxxxxxxx>
Sent: Thursday, January 14, 2010 12:21 PM
To: si-list@xxxxxxxxxxxxx
Subject: [Possible SPAM] [SI-LIST] BGA Breakout.

Hello Gurus;

I am doing some preliminary calculations on the breakout of a 1,400+  Ball
, BGA. Roughly one half of them are signal connections which would need
traces running up to them. The vendor claims you can run two traces between
Vias, my calculations are not adding up, I have a few questions.

1. Generally, do the Vias have a pad even on the signal layer it is not
connecting to?.

2. Do the Vias have a larger pad on the inner layers?

3.  With a Ball pitch
of 1 mm (39 mils.) and an Antipad of 35 mils, there is hardly any room for
one trace between Vias, what am I doing wrong?

Thanks, 

Surita Chandani

------------------------------------------------------------------
To unsubscribe from si-list:
si-list-request@xxxxxxxxxxxxx with 'unsubscribe' in the Subject field

or to administer your membership from a web page, go to:
//www.freelists.org/webpage/si-list

For help:
si-list-request@xxxxxxxxxxxxx with 'help' in the Subject field

List technical documents are available at:
http://www.si-list.net

List archives are viewable at: 
//www.freelists.org/archives/si-list

Old (prior to June 6, 2001) list archives are viewable at:
http://www.qsl.net/wb6tpu

 


------------------------------------------------------------------
To unsubscribe from si-list:
si-list-request@xxxxxxxxxxxxx with 'unsubscribe' in the Subject field

or to administer your membership from a web page, go to:
//www.freelists.org/webpage/si-list

For help:
si-list-request@xxxxxxxxxxxxx with 'help' in the Subject field


List technical documents are available at:
                http://www.si-list.net

List archives are viewable at:     
                //www.freelists.org/archives/si-list
 
Old (prior to June 6, 2001) list archives are viewable at:
                http://www.qsl.net/wb6tpu
  



------------------------------------------------------------------
To unsubscribe from si-list:
si-list-request@xxxxxxxxxxxxx with 'unsubscribe' in the Subject field

or to administer your membership from a web page, go to:
//www.freelists.org/webpage/si-list

For help:
si-list-request@xxxxxxxxxxxxx with 'help' in the Subject field


List technical documents are available at:
                http://www.si-list.net

List archives are viewable at:     
                //www.freelists.org/archives/si-list
 
Old (prior to June 6, 2001) list archives are viewable at:
                http://www.qsl.net/wb6tpu
  

Other related posts:

  • » [SI-LIST] SI applications engineer opening in Dallas TX - Jackie