Re: OS Patches

  • From: Harel Safra <harel.safra@xxxxxxxxx>
  • To: pnedeljkovich@xxxxxxxxxxxxxxx
  • Date: Tue, 16 Feb 2010 19:53:37 +0200

Hi Peter,

I opened an SR on the same issue. Running a mixed cluster with different versions of the same OS release is supported for the duration of the rolling upgrade (i.e. hours, not days).

I'd make sure to test it before.

Harel

On 16/02/2010 15:45, Peter Nedeljkovich wrote:

We've got a 4 node RAC 11gR1 on Linux 4.7 with ASM. We need to bring the latest patches into the OS and I was wondering what the best practice would be. I realize that we could do a rolling patch if we were patching CRS or the databases but can that be done for the OS? Would it be better (Safer?) to shutdown the whole RAC and do the OS patch to one node at a time or can we leave 3 nodes up while patching one?

Peter Nedeljkovich

DBA

Georgian College

705-728-1968 Ext. 1217

Other related posts: