Gurus, We are doing some proof of concept testing on AQ notification callback. Our scenario is that there would be having 2 queues Queue A -- Single Consumer High Priority Messages Queue B -- Single Consumer Low Priority Messages. We have configured PL/SQL callbacks for both these queues. My question can we configure/control the notification callback concurrency for each of these separately?. i.e. I need to configure Queue A to be with a maximum notification concurrency of X ( concurrency here means parallel callbacks for dequeue) and that of Queue B to be maximum notification concurrency of X/4 (say). If it had been a classical MDB callback then I can control max beans property of each of the MDB's to this effect. Any insight would be appriciated. Thanks and Regards Sriram Kumar