[ibis-editorial] Re: Version 6.0, Draft 8.0 Posted

  • From: "Muranyi, Arpad" <Arpad_Muranyi@xxxxxxxxxx>
  • To: Bob Ross <bob@xxxxxxxxxxxxx>, 'Mike LaBonte' <mike@xxxxxxxxxxx>
  • Date: Tue, 30 Jul 2013 18:45:34 +0000

I think this should be announced on the Editorial
email reflector so people can come prepared to the
meeting...

Arpad
====================================================

From: Bob Ross [mailto:bob@xxxxxxxxxxxxx]
Sent: Tuesday, July 30, 2013 12:18 PM
To: 'Mike LaBonte'
Cc: Muranyi, Arpad; wkatz@xxxxxxxxxx; 'Anders Ekholm'; lwang@xxxxxxxxxx; 'Randy 
Wolff'; michael@xxxxxxxxxx; ibis-editorial@xxxxxxxxxxxxx
Subject: RE: Version 6.0, Draft 8.0 Posted

Mike:

We will definitely introduce the latest draft at the next
teleconference meeting.

If the latest draft is stable (perhaps a few days or a week
before) we can make an e-mail announcement to the
IBIS reflector.

Bob

From: Mike LaBonte [mailto:mike@xxxxxxxxxxx]
Sent: Tuesday, July 30, 2013 10:13 AM
To: Bob Ross
Cc: 'Muranyi, Arpad'; wkatz@xxxxxxxxxx<mailto:wkatz@xxxxxxxxxx>; 'Anders 
Ekholm'; lwang@xxxxxxxxxx<mailto:lwang@xxxxxxxxxx>; 'Randy Wolff'; 
michael@xxxxxxxxxx<mailto:michael@xxxxxxxxxx>; 
ibis-editorial@xxxxxxxxxxxxx<mailto:ibis-editorial@xxxxxxxxxxxxx>
Subject: Re: Version 6.0, Draft 8.0 Posted

Hi Bob,

Will there be a list announcement?

Mike
On 7/30/2013 11:54 AM, Bob Ross wrote:
All:

Draft 8.0 is posted and contains the following editorial changes:

- All subsections (e.g., 10.2, 10.3 ... 10.7) begin on new pages
- The Model_Specific Parameters and Tapped Delay Line Example
subsections were moved from Section 10.5 back to Section 10.3
- The Reserved Parameter Summary Tables 31 and 32 were sorted similar to Table 
30

http://www.eda.org/ibis/ver6.0_wip/

Bob

From: Bob Ross [mailto:bob@xxxxxxxxxxxxx]
Sent: Saturday, July 27, 2013 2:16 PM
To: 'Mirmak, Michael'; 'Muranyi, Arpad'; 
wkatz@xxxxxxxxxx<mailto:wkatz@xxxxxxxxxx>; 'Anders Ekholm'; 
lwang@xxxxxxxxxx<mailto:lwang@xxxxxxxxxx>; 'Mike LaBonte'; 'Randy Wolff'
Cc: michael@xxxxxxxxxx<mailto:michael@xxxxxxxxxx>; 
bob@xxxxxxxxxxxxx<mailto:bob@xxxxxxxxxxxxx>
Subject: RE: Draft 7.0 - with corrections

All,

Michael, thanks for all of your good work on Version 6.0.

Attached and also posted is Draft 7.0 with table sequencing
corrections and a few editorial fixes:

http://www.eda.org/ibis/ver6.0_wip/

1. Sections 10.3 - 10.7, Tables manually re-sequenced as needed
2. Table 20 (a copy of Table 33) re- inserted in Section 10.3 since
that is where the content was first introduced
3. Table 31 - two extra blank lines at bottom removed
4. Table 32 - four repeated Rx and Tx jitter/noise parameters removed
5. Tables 30 -32: footnote 3 inserted to document the 18 new
parameters in Section 10.7 in all three tables.
6. A few editorial corrections (including adding 7 BIRDs), date/copyright
corrections (August 24, 2012 to September 20, 2013), version fixes
where appropriate ([IBIS Ver] 5.1 to [IBIS Ver 6.0]), etc.

Let me know if you see some issues.

Note, some of the table formatting may have been messed up,
and I did reduce the font size to 11 for a couple of parameters in Table 30
to insert note 3.

This version or a corrected version will be ready for introduction at the
next teleconference meeting.

Bob

From: Mirmak, Michael [mailto:michael.mirmak@xxxxxxxxx]
Sent: Friday, July 26, 2013 10:16 PM
To: Bob Ross; Muranyi, Arpad; wkatz@xxxxxxxxxx<mailto:wkatz@xxxxxxxxxx>; Anders 
Ekholm; Lance Wang <lwang@xxxxxxxxxx><mailto:lwang@xxxxxxxxxx>; Mike LaBonte 
(mike@xxxxxxxxxxx<mailto:mike@xxxxxxxxxxx>); Randy Wolff
Cc: michael@xxxxxxxxxx<mailto:michael@xxxxxxxxxx>
Subject: Draft 6.0 - needs corrections
Importance: High

All,

Please find enclosed Draft 6.0 (provisional) of the IBIS 6.0 specification.  
This includes all of the changes and adjustments we discussed in the last few 
meetings plus some corrections suggested by Randy.

However...

This version has an issue with the table captions.  I need someone to carefully 
check the table captioning to ensure that the numbers are sequential *and* are 
available in the cross-references section of the document.

Otherwise, everything is ready.  Please feel free to post this as RC-1 or draft 
7 (your preference) once the corrections are complete.  We are ready for a 
Sept. 20 release.

Thank you!


-          MM

Other related posts: