[wsmac] Re: Surveying Crew working at Bridge and Cumberland Streets Intersection

  • From: Dennis Marrotte <dennis.marrotte1111@xxxxxxxxx>
  • To: wsmac@xxxxxxxxxxxxx
  • Date: Tue, 1 May 2018 14:18:03 -0400

Thank You Ann.  I was there awhile ago.  Survey Crew were working on both
sides of the uphill lanes of Bridge Street and also had a transit tripod
set up on the north bound side of Cumberland Street Sidewalk between Lowell
and Webster Streets.

T / Y !
Dennis
On May 1, 2018 2:12 PM, "Ann Peoples" <annpeoples11630@xxxxxxxxx> wrote:

Not sure, Dennis! I'll go take a look!

Ann

On Tue, May 1, 2018 at 1:50 PM, Dennis Marrotte <
dennis.marrotte1111@xxxxxxxxx> wrote:

Hello on May 1st !  A Surveying Crew is working on all 4 Sections of the
busy Bridge and Cumberland Streets Intersection today.  I decided to walk
to Severino' s Store.

Using the Pedestrian Activated Crosswalk, I asked one of the Surveyors
what they were doing. " They are gathering data for a street rebuild ? "  I
noticed several Meridian Laser Markers at points along the Sidewalk on
Cumberland Street from Lowell to Webster Streets.   Does anyone know what
is happening ?

Thank You,
Dennis



Other related posts: