[TN-Bird] Re: Cades Cove Closing

  • From: Tsuruoka Harumi <harumi0404@xxxxxxxxxxx>
  • To: "randywendy@xxxxxxx" <randywendy@xxxxxxx>, "ablroyce@xxxxxxxxx" <ablroyce@xxxxxxxxx>
  • Date: Fri, 3 Jan 2020 01:02:56 +0000

Hi,
It will be closed to all "motorists, cyclists, and pedestrians". I'd like to 
share the following:


Park Reminds Visitors about Cades Cove Winter Closure

Great Smoky Mountains National Park officials remind visitors that Laurel Creek 
Road, the seven-mile access road leading from the Townsend Wye to Cades Cove, 
will be closed to all motorists, cyclists, and pedestrians at 8:00 p.m. on 
Sunday, January 5 through Saturday, February 29 to repair the Bote Mountain 
Tunnel.

The full closure, beginning just past Tremont Road, is necessary to allow 
equipment set-up for the repair of the internal drainage system in the walls 
and ceiling of the 121-foot long tunnel. Crews will enclose and heat the 
tunnel, allowing the temperature-sensitive repairs to be conducted during the 
winter months when visitation is lower. Intermittent single-lane closures will 
be necessary between March 1 and June 15 to complete the tunnel repairs and to 
re-pave the tunnel area.

The Cades Cove Campground, normally open during the winter months, will be 
closed December 30, 2019 through March 5, 2020. To accommodate winter campers, 
Elkmont Campground will remain open year round along with Smokemont Campground 
in NC.

The Bote Mountain Tunnel, constructed in 1948, has not had any significant 
rehabilitation work since that time. Crews will replace nine drainage chases 
requiring track-mounted saws to cut through the concrete liner along the arc of 
the 18-foot high tunnel opening. Cracks throughout the tunnel would also be 
sealed and repaired. Without repairs, leaks will lead to compromised concrete 
walls and the development of ice hazards during the winter months.

For more information about road closures, please follow SmokiesRoadsNPS on 
twitter or visit the park website.

******************************************************
Harumi Tsuruoka, Maryville, Blount County, TN


________________________________
差出人: tn-bird-bounce@xxxxxxxxxxxxx <tn-bird-bounce@xxxxxxxxxxxxx> が Alice Beth & 
Lew <ablroyce@xxxxxxxxx> の代理で送信
送信日時: 2020年1月2日 15:04
宛先: randywendy@xxxxxxx <randywendy@xxxxxxx>
CC: TNBird <tn-bird@xxxxxxxxxxxxx>; Bill Holt <wjholtjr@xxxxxxxxx>
件名: [TN-Bird] Re: Cades Cove Closing

I believe you can access Cades Cove while the road is closed...but it is going 
to take a really long walk.

On Thu, Jan 2, 2020 at 1:11 PM Randy Winstead 
<randywendy@xxxxxxx<mailto:randywendy@xxxxxxx>> wrote:
Cades Cove is open until 8:00 P.M. Sunday.  It is supposed to rain through 
Saturday.  There will probably be an incredible mass of people there on Sunday.

Randy Winstead
Maryville, Blount County

On Thursday, January 2, 2020, 12:47:57 PM EST, Bill Holt 
<wjholtjr@xxxxxxxxx<mailto:wjholtjr@xxxxxxxxx>> wrote:


According to reports, Cades Cove is now closed until March due to construction 
work. If anyone has any information about other ways to visit the property, 
please let me know. I'd like to see the Short-Eared Owls again.

Happy New Year

Bill Holt
Hixson, TN
Hamilton County

Other related posts: