[THIN] Re: Rollup Pack install order

  • From: "alan tropper" <alan.tropper@xxxxxxxxxxxxx>
  • To: "thin@xxxxxxxxxxxxx" <thin@xxxxxxxxxxxxx>
  • Date: Tue, 13 Apr 2010 11:24:53 +0800

Cheers!

 

________________________________

From: thin-bounce@xxxxxxxxxxxxx [mailto:thin-bounce@xxxxxxxxxxxxx] On Behalf Of 
Webster
Sent: Tuesday, 13 April 2010 10:00 AM
To: thin@xxxxxxxxxxxxx
Subject: [THIN] Re: Rollup Pack install order

 

You may want to check out build 10007 of License Server 11.6.1.  IIS and Java 
are no longer required.

 

 

Webster

 

From: thin-bounce@xxxxxxxxxxxxx [mailto:thin-bounce@xxxxxxxxxxxxx] On Behalf Of 
alan tropper
Subject: [THIN] Re: Rollup Pack install order

 

I was just checking before installing..looked at pre-reqs and looks like same 
as R05 so don't think there will be any gotchas.

 

Thanks

 

Al

 

________________________________

From: thin-bounce@xxxxxxxxxxxxx [mailto:thin-bounce@xxxxxxxxxxxxx] On Behalf Of 
Webster
Subject: [THIN] Re: Rollup Pack install order

 

I have only installed in my lab but had no issues.  Did you have issues or just 
checking before you install it?

 

Make sure you read the prereqs before installing.

 

 

Webster

 

From: thin-bounce@xxxxxxxxxxxxx [mailto:thin-bounce@xxxxxxxxxxxxx] On Behalf Of 
alan tropper
Subject: [THIN] Re: Rollup Pack install order

 

Has anyone had any issues with installing Rollup 6?

 

________________________________

From: thin-bounce@xxxxxxxxxxxxx [mailto:thin-bounce@xxxxxxxxxxxxx] On Behalf Of 
Webster
Subject: [THIN] Re: Rollup Pack install order

 

As soon as you installed R06 on the test server, that test server became the 
ZDC.

 

 

Webster

 

From: thin-bounce@xxxxxxxxxxxxx [mailto:thin-bounce@xxxxxxxxxxxxx] On Behalf Of 
Angela Smith
Subject: [THIN] Rollup Pack install order

 

Hi

Im looking at installing Rollup 6 on XenApp 4.5.  The Citrix best practice 
guide states the install should be in the following order:

1. Zone data collector
2. Backup zone data collectors
3. Database connection server (Resource Manager)
4. Primary farm metric server (Resource Manager)
5. Backup farm metric server (Resource Manager)
6. Member servers


The guide also states you should put it on a test server.  I dont have a dev 
farm but I do have test servers on the Production farm.  I have installed R06 
on a test server but the ZDC is still on R05.  Will I have issues or should I 
install R06 on the ZDC now?

Other related posts: