There's a vigorous discussion on the aRocket list (surprise!) about FAA 
approval for Class 3 flights.

To summarize, it seems they still require 3 Sigma dispersion analysis and 
dynamic stability analysis, 
and one poster mentioned "that's why no 2-stage projects".  Then it was stated 
that although it's
not cheap, the FAA does accept data from Rocksim Pro.

Then the following comment:  If you're a Tripoli member, they have a Class 3 
committee that will do
the analysis for you -- and they use Rocksim Pro.

If accurate (and I have no reason to doubt it), this could make things quite a 
bit easier when it
comes time to get that approval.

Cheers,
Mark L.
DC


This was also pasted as the most relevant portion of the current FAA regs:

(a) Class 2---High-Power Rockets. When a Class 2---High-Power Rocket 
requires a certificate of waiver or authorization, the person planning 
the operation must provide the information below on each type of rocket 
to the FAA at least 45 days before the proposed operation. The FAA may 
request additional information if necessary to ensure the proposed 
operations can be safely conducted. The information shall include for 
each type of Class 2 rocket expected to be flown:
(1) Estimated number of rockets,
(2) Type of propulsion (liquid or solid), fuel(s) and oxidizer(s),
(3) Description of the launcher(s) planned to be used, including any 
airborne platform(s),
(4) Description of recovery system,
(5) Highest altitude, above ground level, expected to be reached,
(6) Launch site latitude, longitude, and elevation, and
(7) Any additional safety procedures that will be followed.
(b) Class 3---Advanced High-Power Rockets. When a Class 3---Advanced 
High-Power Rocket requires a certificate of waiver or authorization the 
person planning the operation must provide the information below for 
each type of rocket to the FAA at least 45 days before the proposed 
operation. The FAA may request additional information if necessary to 
ensure the proposed operations can be safely conducted. The information 
shall include for each type of Class 3 rocket expected to be flown:
(1) The information requirements of paragraph (a) of this section,
(2) Maximum possible range,
(3) The dynamic stability characteristics for the entire flight profile,
(4) A description of all major rocket systems, including structural, 
pneumatic, propellant, propulsion, ignition, electrical, avionics, 
recovery, wind-weighting, flight control, and tracking,
(5) A description of other support equipment necessary for a safe operation,
(6) The planned flight profile and sequence of events,
(7) All nominal impact areas, including those for any spent motors and 
other discarded hardware, within three standard deviations of the mean 
impact point,
(8) Launch commit criteria,
(9) Countdown procedures, and
(10) Mishap procedures.



 