All:
Attached is the tentative Agenda for a full meeting with 10
presentations. We look forward to seeing you in Shanghai.
Registration information is at the end.
Lance and Bob
------------------------------------------------------------------
A S I A N I B I S S U M M I T I N F O R M A T I O N
Time/Date: 8:15 - 17:30, Monday, November 9, 2015
Location: Parkyard Hotel Shanghai
699 Bibo Road
Zhangjiang Hi-Tech Park
Shanghai 201203
P.R. China
Rooms: Ballroom ABC (Look for signs)
Sponsors: Huawei Technologies (Primary)
IO Methodology
Keysight Technologies
Synopsys
Teledyne LeCroy
ZTE Corporation
------------------------------------------------------------------
I B I S S U M M I T M E E T I N G A G E N D A
8:15 SIGN IN
- Vendor Tables Open at 8:30
8:45 WELCOME
- Li, JinJun
(Huawei Technologies, PRC)
- LaBonte, Mike (Chair, IBIS Open Forum)
(Signal Integrity Software (SiSoft) USA)
9:00 IBIS Chair's Report
LaBonte, Mike (Signal Integrity Software (SiSoft), USA)
9:25 Introducing IBIS Version 6.1
Mirmak, Michael (Intel Corporation, USA)
9:45 Enabling Full Power-aware Bus Simulation with Non-IBIS
Device Model - A Kit Using IBIS [External Model]
Liang, Skipper (Cadence Design Systems, ROC)
10:35 BREAK (Refreshments and Vendor Tables)
10:55 A Practical DOE Application in Statistical SI Analysis
Using IBIS & How Can We Make IBIS Work Beyond Best
Case/Worst Case?
Shi*, Feng; Ekholm**, Anders; Mahmod**, Zilwan and
Zhang*, David (Ericsson, *PRC, **Sweden)
11:25 IBIS Interconnect BIRD Update
Katz, Walter (Signal Integrity Software (SiSoft), USA)
12:00 FREE BUFFET LUNCH (Hosted by Sponsors)
- Vendor Tables
13:30 FEC Applications for 25Gb/s Serial Link Systems
Guo, Tao; Zhu, ShunLin (ZTE Corporation, PRC)
14:00 PAM4 System Simulation Using AMI Models
Rao, Fangyi (Keysight Technologies, USA)
14:30 Some Results for General K-table Extraction Proposal
Using SPICE
Ross*, Bob; Chen**, XueFeng
(*Teraspeed Labs, USA, **Synopsys, PRC)
15:00 BREAK (Refreshments and Vendor Tables)
15:20 IBIS Simulation Case Study: Unexpected Glitch and
Using C_fixture, Wang, Lance (IO Methodology, USA)
15:50 Laplace Transform Time Response Utility
Ross, Bob (Teraspeed Labs, USA)
16:20 DISCUSSION
17:20 CONCLUDING ITEMS
17:30 END OF IBIS SUMMIT MEETING
------------------------------------------------------------------
To Register by November 5, 2015:
Name:
E-mail address:
Company:
Top-level Web Link:
Country:
Send to BOTH:
Lance Wang, IO Methodology Inc. lwang@xxxxxxxxxx
Bob Ross, Teraspeed Labs bob@xxxxxxxxxxxxxxxxx
--
Bob Ross
Teraspeed Labs
http://www.teraspeedlabs.com
bob@xxxxxxxxxxxxxxxxx
Direct: 503-246-8048
Office: 971-279-5325
------------------------------------------------------------------
To unsubscribe from si-list:
si-list-request@xxxxxxxxxxxxx with 'unsubscribe' in the Subject field
or to administer your membership from a web page, go to:
//www.freelists.org/webpage/si-list
For help:
si-list-request@xxxxxxxxxxxxx with 'help' in the Subject field
List forum is accessible at:
http://tech.groups.yahoo.com/group/si-list
List archives are viewable at:
//www.freelists.org/archives/si-list
Old (prior to June 6, 2001) list archives are viewable at:
http://www.qsl.net/wb6tpu