[rc3r] Re: Today at gbgh

  • From: Peter Mellon <peter.mellon@xxxxxxxxxxx>
  • To: rc3r@xxxxxxxxxxxxx
  • Date: Mon, 17 Dec 2018 09:48:54 -0500

The donations are in the cash box.

I was going to spike all 3 of the rails on the 10” piece of outside track on 
the bridge, next to the hinge. That section sticks up a bunch. Part of the 
height is due to the track being separated from the ties and some of it is due 
to the bed’s being shimmed at that end.  I called Tom and he thinks it may be 
easier to just replace that piece of track.  He will stop by the trailer when 
he gets a chance to get a piece of track and replace it.

Tom, let me know what else I can do to help. I’m around till about 4 today.

Peter Mellon
Sent from my iPhone

On Dec 17, 2018, at 8:54 AM, Thomas Gilsdorf <tlg225ccr94@xxxxxxxxxxx> wrote:

Thanks, Peter. 

If you would, just put it in the cash box. That should be inside the big 
black box. The combo is "611". I'll swing by later today to pick it up. There 
is a scheduling meeting tomorrow and I'll be seeing Dexter then.

Gilly


-----Original Message-----
From: Peter Mellon <peter.mellon@xxxxxxxxxxx>
To: rc3r <rc3r@xxxxxxxxxxxxx>
Sent: Sun, Dec 16, 2018 11:56 pm
Subject: [rc3r] Re: Today at gbgh

I’ll plan to respike tomorrow morning.

Peter Mellon
Sent from my iPhone

On Dec 16, 2018, at 8:19 PM, kevopelli@xxxxxxxxx wrote:

Dexter: I left $30 in ones in the box, $78 is banded together in the box 
for the raffle proceeds.  I did not check the donations pot, don’t know if 
was counted or not.

We had 6 kids to run trains. We were short handed, thank you John & Peter 
for staying late and helping. 
Second request , we need 5 people for kids run trains days, in case someone 
doesn’t show or is late or has to leave early.

A schedule should be emailed weekly (for changes & reminders) and posted in 
a conspicuous place inside the layout for everyone to check...  and current 
phone numbers for members, preferably on the schedule so we can call them, 
see ketones people don’t realize there on the schedule.

We had a short problem, maybe  a fried tiu in the earlier session, Peter 
changed it but a short persisted going to the outside mainline. Rick found 
a screw lodged in the switch leading to the outside rail, near the bathroom 
for reference. Thanks Rick.

The outside rail on the geezer gorge needs to be re-spiked, bridge was 
dropped as we were loading to leave.
It was up and one of our kids that ran trains knocked it down.

Kevin


Sent from my iPhone

Other related posts: