[paradiseriders] Re: Thursday, May24th Ride

  • From: Bill Rizzi <rizzi@xxxxxxxxxxxx>
  • To: paradiseriders@xxxxxxxxxxxxx
  • Date: Tue, 22 May 2018 10:47:54 -0700


    Ouch.  Good luck with getting going again.  See you at the P.

    Z


On 5/22/18 10:42 AM, djonathan@xxxxxxx wrote:

Right leg tibial plateau fracture on 2/23, trail running on Rattlesnake, 
carried out by fire department. Plate and screws installed 2/24. A relaxing 
three night stay at Cottage.     I'll be biking before I'm hiking again, just 
not yet.


-David


---- Charles Meyer <charlesmeyer101@xxxxxxxxxxx> wrote:

=============
What happened Dave?

Charles
On May 22, 2018, 10:01 AM -0700, djonathan@xxxxxxx, wrote:

I've been off crutches for 10 days, but stationary bikes are still my speed.

But dinner I can do.

-David

---- Bill Rizzi <rizzi@xxxxxxxxxxxx> wrote:

=============

     I'll do the best I can but y'all are gonna have to have mercy.
Perhaps if I read the article below again I'll be able to do it on rage
alone.

     Z

https://www.independent.com/news/2018/may/21/music-cuts-will-harm-teachers-and-students/


On 5/21/18 10:48 PM, barry@xxxxxxxxxxxxxxxxxxxx wrote:
Okay riders who rides and who dines this Thursday?   Cheers, BW

Barry Winick, AIA, LEED AP, NCARB

WINICKARCHITECTS

T  805 770 3400
F  805 456 1680
C 805 284 1617
404 Garden Street, Santa Barbara, California 93101
barry@xxxxxxxxxxxxxxxxxxxx <mailto:barry@xxxxxxxxxxxxxxxxxxxx>
www.winickarchitects.co <http://www.winickarchitects.co>m

On Apr 13, 2018, at 8:44 AM, Bill Rizzi <rizzi@xxxxxxxxxxxx
<mailto:rizzi@xxxxxxxxxxxx>> wrote:

Acct Asst, PW, Streets Ops - Myndi Hegeman
<https://nextdoor.com/profile/179792/>
Acct Asst, PW, Streets Ops - Myndi Hegeman
<https://nextdoor.com/profile/179792/>,City of Santa Barbara
<https://nextdoor.com/agency/516590/>AGENCY<ambbbaagjecgcegc.png>8
<bapaapalnaedimph.png>


Gibraltar Road Repairs

<https://nextdoor.com/news_feed/?post=80358576>

Beginning April 16th, City Street Operations crews will make repairs
to Gibraltar Road, north of El Cielito Road to the City Limits.
Weather permitting this project will continue for approximately four
weeks with work taking place Monday through Friday, 7 a.m. to 5 p.m.
Repairs will be made to storm drains, berms, and slopes in
preparation for paving the roadway. Drivers and bicyclists should
consider an alternate route since delays can be expected and the
construction area will have rough road conditions and steel plates.
This work is made possible by Measure C – your tax dollars at work.

<https://d3926qxcw0e1bh.cloudfront.net/post_photos/81/7a/817a5c6680ddd44aec783a9c4a8243ce.jpg>
New34m ago·Subscribers of City of Santa Barbara
<jaodhfnpjmoogbgi.png><jaodhfnpjmoogbgi.png>Thank
<ijjdcajbehcjdibi.png>Reply
<bapaapalnaedimph.png>
2 Replies <https://nextdoor.com/news_feed/?post=80358576>

https://nextdoor.com/news_feed/?post=80358576










Other related posts: